User Manual

120 Workplace
the set counter then the current statistical data will first be deleted and
the statistics counter reset to
0.
6 - Main run
When processing the loaded method the following actions can be carried out:
Process main track
After the start of the Main track the status changes to
BUSY. The com-
mands of the main track and the other tracks that it calls up are proc-
essed in sequence. If the main track calls up tracks that are not free
then a pause will be made until these tracks can be started.
Interrupt and continue run
A running determination can be interrupted at any time with
[Hold] and
then continued with
[Cont]. All the active tracks will be stopped and
continued together.
Cancel sequence
A running series can be canceled at any time with
[Stop]. An Exit track
may be carried out; the determination will be terminated.
Cancel by error
If when a determination is being carried out an error occurs that
causes the cancellation of the determination then an Error track may
be carried out; the determination will be terminated.
Process exit track
When the main track and all the other tracks that it has called up have
been completed then an Exit track may be carried out; the determina-
tion will be terminated. After the end of the Main track the status
changes to
READY.
7 - Post-conditioning (only for methods with conditioning)
In methods that contain commands with switched-on conditioning and in which
the option
Automatic conditioning is switched on in the START command then for all
these commands post-conditioning will be started automatically with the loaded
method immediately after the end of the track that contains the conditioning
command.
Conditioning requirement not fulfilled
After the start of post-conditioning the status changes to
COND BUSY.
In this status a new determination can be started with
[Start], even
though the conditioning requirement has not been fulfilled. Condition-
ing can also be canceled with
[Stop] or interrupted with [Hold] and
then continued with
[Cont]. If an error occurs during conditioning then
neither the Error track nor the Exit track will be carried out.
Conditioning requirement fulfilled
If the conditioning requirement has been fulfilled then the status
changes to
COND READY. In this status a new determination can be
started with
[Start]. Conditioning can also be canceled with [Stop] or
interrupted with
[Hold] and then continued with [Cont]. The condition-
ing requirement will continue to be monitored continuously until the
determination has been started.