Operating instructions

4
Operating instructions METTLER TOLEDO AT balances
STANDBY
Prepare the glass draft shield
The draft shield of your AT balance
comprises several parts which can be
combined in a number of ways using
the coupling elements. To preclude
transport damage, these coupling
elements are not locked in position
when shipped. Connect the individual
parts of the draft shield as follows:
- Pull all doors of the draft shield and
the opposing door holder 14 for-
wards as far as possible.
- Push the two upper coupling
elements 9 and 10 upward and the
two lower coupling elements 11 and
12 downward until they lock.
When in this position, the whole draft
shield opens. Additional combination
possibilities of the individual doors are
described in Section 2.1.
Connect your AT to the power
supply
- Connect the AC adapter supplied to
connection socket 23 at the rear of
your AT balance and then to the
power supply.
- The AC adapter can either be
placed on the bench, attached to
the balance or, to save space, be
mounted on the wall. The AC adap-
ter holder and the installation set
with dowels and screws are used
for this. Appropriate details are
given in Section 6.1.
After connection, your AT balance is
on standby and ready for weighing
after a brief warm-up time of about 5
minutes. (See also Technical
specifications page 84).