Installation Instructions

METTLER TOLEDO
11.11.2016, mme Ver.1.0
Installation of THVQCB
The image below shows how the PCB is assembled to the dosing unit.
The PCB is attached with two M3x5 TORX screws.
The RFID antenna cable is pluged in as shown in the image.
RFID Antenna
Cable
Motor Controler 1
Cable
Motor Controler 2
Cable
Mini-z Cable
CAN Cable