Early Warning Alert”: Define how early the warning should appear. E.g. set a reminder for 7 days before the battery is due to
be changed. If the test has passed within the Early Warning period, the test will be recorded as “Passed
with Warning”. If the Early Warning period has elapsed, the test will fail. The “Instructions if Failure” can
provide further instructions to the user (see section 3.2.1).
Valid range of input: 1 - 365 days
Factory Setting: 7 days
Note: Using the Early Warning Alert as a reminder for another Task to be performed requires the creation
of two Tasks – one for the original Test Sequence and one for the reminder.
Note: Multiple dates can be simultaneously checked with the Service Method (see multiple selections
in “Status”). However, the same Early Warning period is valid for all scheduled dates. If varying Early
Warning periods are required, several Service Methods must be defined.
Note: The reminder Task must be set up to check the dates on a regular basis; choose the frequency
of the check in relation to the Early Warning period and the frequency of the Test Sequence to be
performed.
For information on configuring Tasks, see section 3.3.
A complete list of the settings can be printed out by pressing the «F» key while the Test Sequence menu is open.
The SERVICE Method can also be used for the sole purpose of displaying the “Preparation Instructions” e.g. so the user can be informed
to level the balance each day. In this special case, set the “Preparation Instructions” to “Standard” in the Test Sequence settings and
ensure NO items in the “Method Status” are selected.