User manual

22
To Perform a Control Solution Test
1. Make sure the Control Solution is at room temperature (59ºF to 95ºF or
15ºC to 35ºC) prior to testing.
2. Insert a Test Strip, white side face up with the Contact Bar’s end rst,
Push all the way into test port until meter automatically turns on. (Fig.10)
3. All segments of the LCD display will appear, a beep will sound and
moving dotted lines will appear followed by a ashing “ symbol. (Fig.11)
4. After the “ “ symbol appears, press the S button for 3 sec to switch
control solution mode. The “ ctl “ symbol indicates that the Meter will
mark your current test as a Control Solution test. Now you are ready to
apply the Control Solution.(Fig.12)
(Fig.11)
(Fig.12)
(Fig.10)