Specifications
8 
The system needs to be able to expand for features to be added in the future. 
Later on the sponsors may want to develop another version of the system with an 
expanded feature list. The microcontroller is required to have extra memory 
available to add these features. Possible features to be added to the system are 
listed below: 
  Scented Air 
  Air Purification 
  Air flow rate component to provide an alert for the user when a new filter 
is necessary 
  Possibility of integration with a weather server to provide the user with a 
“severe weather alert” 
  Expanded controls for larger HVAC systems consisting of more than 2 AC 
units 
  CO2 sensors to alert the user of CO2 inside the building 
1.5 Roles and Responsibilities 
1.5.1 Division of Labor 
In  order  for  our group  to  be  successful,  the  project must be  decomposed  into 
parts  and each part  must  be assigned  to  a  group member.   Our group  is 
composed  of  three  Electrical  Engineers,  and  one  Computer  Engineer  and  we 
have divided the work according to our group member‟s area of expertise.  Each 
member is responsible of a particular component of the design process as shown 
in  Figure  2.    Collaboratively  we  are  all  striving  to  reach the  same  goal  of 
designing  and  implementing  a  useful  and  efficient  HVAC  control  system  that 
meets the specifications and requirements of both our Senior Design course, as 
well as our sponsors.  Diving labor amongst the group members will allow each 
member to focus on a specific component of the overall design, and when 
problems arise  during the  build of  the system  the group  will know  who is best 
prepared to produce a solution. 
Derick‟s  primary  responsibility  was  the  design  of  the  printed  circuit  boards  and 
power supply distribution.  This area is extremely important because the printed 
circuit boards determine the layout of how each component of the HVAC control 
system will operate.  The printed circuit boards provide a means for components 
such as the microcontrollers, wireless devices, and sensors to communicate to 
the control unit via the router and vice versa.  In any control system data transfer 
is  essential  so  that  the  correct  decisions  can  be  made  and  feedback  can 
accurately be assessed. 
Josh‟s primary responsibility in the project is integration of the web server into the 
system and lead programmer.  Although all group members will be involved in 
the programming process, Josh is the only Computer Engineer therefore he has 
the most programming experience in the group and is best fit for the role of lead 