Our  project  was  selected  during  the  first  meeting  with Dr.  Richie  when  he 
reviewed  our  “iTemp”  project  idea  and  asked  us  if  we  would  like  to  accept  a 
project that had been brought to his attention by AC3 Development Group, LLC. 
After the meeting with Dr. Richie, we decided to set up milestones for our group. 
The milestones would help us in several ways.  They would allow us to  better 
“divide and conquer” the paper, rather than looking at it as one huge assignment. 
We felt it is easier to think of the paper as multiple smaller reports than one huge 
assignment.  The milestones also would prevent us from getting close to the due 
date  (August  4,  2010)  and having  so  much  left  to  complete  that  we  would  be 
forced to work around the clock to complete the assignment.  We looked at the 
layout of several papers from previous groups and  were able to determine the 
following  guidelines  for  completing  the  paper  in  a  timely  manner.  Figure  4 
pictured below is a milestone timeline. 
  Completion of Introduction/Definition 6/26/2010:  This consists the almost 
all  of  the  Introduction/Definition  section  including  Executive  Summary, 
Motivation,  Objective,  Detailed Specifications  and Requirements,  Roles 
and  Responsibilities,  Block  Diagrams,  Timelines  and  Milestones,  and 
Budget and Financing information.  This is the first step in completing our 
paper and is essential to complete prior to working on research. 
  Preliminary  Research  Completion  7/5/2010:    This  is  the  first  major 
milestone for the group.  At this point we have picked the majority of the 
hardware  components  to  be  implemented  into  our  system.    The 
components  have  been  picked  so  they  meet  the  specifications  and 
requirements set by our sponsors.  Although they have not been ordered 
at this point, the group has decided that they are applicable for the system 
and that they will successfully be integrated together. 
  Rough Draft Due 7/19/2010:  This is the second major milestone for the 
group. The rough draft is due at 8:00 AM in class on 7/19/2010. Although 
the  rough  draft  is  not  graded,  Dr.  Richie  informed  us  that  he  expects 
somewhere  around  60  pages.    This  is  an  important  date  for  the  group 
because it shows exactly how much we have done and how much is still 
needed to complete the paper. 
  Completion of Preliminary Design 7/22/2010:  This date signifies that the 
group has documented information from the data sheets for the hardware 
components.  This information should  include detailed  information about 
all hardware components and how they will be integrated together.  At this 
point all parts should be ordered. 
  Completion  of  All  Content  7/25/2010:    At  this  point  all  content  for  the 
document should be completed and integrated into a single .docx file. The 
only remaining  tasks for the  group is to  proof read the document for 
spelling  and  grammatical  errors,  making  sure  all  information  is  properly 