Figure 4 Milestone Timeline
Figure 5 pictured below is another timeline. This timeline describes the meetings
that have been set up to discuss the project. The most common of these
meetings is between the members of the group. The group on average meets
three times per week in the Harris Engineering Building. Group meetings are
informal and typically last 1-2 hours. The purpose of these meetings is to
collaborate with the group members about progress that has been made on each
individual‟s subsystem that is being worked on. Although each individual is
responsible for a subsystem or part of a subsystem, these meetings keep all
group members informed about all parts of the project and keeps the group
acting as a whole so that everyone has a complete understanding of the project
as a whole. These events do not include phone calls, text messages, and Skype
conversations pertaining to the project which occur on a daily basis. Due to a
high number of group meetings, they are abbreviated to GM on the timeline.