
Doc Number: VIS-ANA-VER-01001-9002
Date: 27 May 2004
Issue: 5.0
Page: 25 of 80
Author: J. Delgadillo
Controls Preliminary Design Report Issue 5.doc
During the integrated testing at Mexia, Texas, the optimal rate loop compensation will be
determined.
4.2.2.1.C - Preload Scheme Plot