Installation Instructions

Chart6
Body
Ceiling
Chart7
6
B.Newbuilthousesandceilings
a.Inthecaseofnewbuilthouse,thehookcanbeembeddedinadvance(refertotheA.Bmentioned
above).Butitshouldbestrongenoughtobeartheindoorunitandwillnotbecomeloosebecause
ofconcreteshrinking.
b.Afterinstallingthebody,pleasefastentheinstallationpaperboardontotheairconditionerwith
bolts(M612)todetermineinadvancethesizesandpositionsoftheholeopeningonceiling.
Pleasefirstguaranteetheflatnessandhorizontalofceilingwheninstallingit.
RefertotheA.amentionedaboveforothers.
c.RefertotheA.cmentionedaboveforinstallation.
d.Removetheinstallationpaperboard.
×
Aftercompletionofinstallingthebody,thefourbolts(M612)mustbefastenedtotheair
conditionertoensurethebodyisgroundedwell.
×
Neverputthepanelfacedownonfloororagainstthewall,oronbulgyobjects.
Nevercrashorstrikeit.
(1)Removetheinletgrid.
a.Slidetwogridswitchestowardthemiddleatthesametime,andthenpullthemup.(Refertochart8)
b.Drawthegriduptoanangleofabout45,andremoveit.(Refertochart9)
0
Gridswitch
Chart8 Chart9 Chart10
(2)Removetheinstallationcoversatthefourcorners.
Wrenchoffthebolts,loosetheropeoftheinstallationcovers,andremovethem.(Refertochart10)
ThelengthcouldbecalculatedfromChart5
Length=H-181+L(ingeneral,L=100mmandishalfofthewholelengthoftheinstallationhook)
c.Pleaseadjustthehexangularnutsonthefourinstallationhooksevenly,toensurethebalanceofthe
body.
Ifthedrainpipeisawry,leakagewillbecausedbythemalfunctionofthewater-levelswitch.
Adjustthepositiontoensurethegapsbetweenthebodyandthefoursidesofceilingareeven.The
body'slowerpartshouldsinkintotheceilingfor10~12mm(Refertochart5).
Locatetheairconditionerfirmlybywrenchingthenutsafterhavingadjustedthebody'spositionwell.
2.InstallThePanel
CAUTIONS
CAUTIONS