Manual
5 | Page 10- 342- 1 REV: B
MNCDL
INSTRUCTIONS CONTINUED
NOTE: To run the equalize cycle on the inverter or other charge controllers, simply turn off the breaker on the
diversion controller and run your EQ charge. After the EQ charge is complete do NOT forget to turn the
breaker back on.
Connections
• Spring lever terminals for Battery + and Battery -
Accepts #10-24 AWG
• Two 1/2" / 3/4" concentric NPT knockouts and two 1/2" NPT
knockouts
Mounting
• Mounts to vertical concrete, metal, or other non-flammable surface
• Uses four #10 screws
• Body sits 19mm out from wall
• NEMA 1 enclosure for indoor mounting