More tidbits to digest
Important! Torque din rail mount breakers Installing the breaker cover
to 20 in lb. Wait one hour and re-torque.
Six locations are available for additional 13mm wide breakers. These breakers would normally
be field installed for such things as: solar, wind or hydro charge controllers, DC ground fault
protector, AC and or DC distribution center and others. Remove the cut outs for the intended
breakers. Each 13mm wide breaker requires removal of two cut outs. 17.5mm wide breakers
require removal of three cut outs. It is important to torque the terminals to 20 inch pounds. It is
highly recommended to go back over all terminations after an hour and also conduct a pull test.
Doors
installed,
plastic conduit
installed,
wiring
complete.
Note the
battery cable
routing. It is
important to
route cables so
the doors close
freely without
undue force.
The left E-
Panel battery
cables came
from above,
but could have
come from
below or back.