Assembly Instructions

PREPARE:
ASHWELL FIRE PIT DIMENSIONS
TABLE OF CONTENTS
Level 1 - Level 4
Materials List
Tool Check List
Foundation Guidelines
ASSEMBLE:
Finished Elevations
ENJOY:
Use and Care Instructions
More Concrete Block Ideas
2
3
3
5
6
7
8
4
PREPARE
TECHNIQUES
Fasten each layer of block together with
1/4” - 3/8” bead of adhesive on all bottom
block faces unless otherwise
noted. Refer to the adhesives application
instructions for proper use.
Follow suggestions on page 3 to build a proper foundation before starting your new project. If not
already set, place the rst level of block 1- 2” below grade, level and ll in any gaps. Use Level 1
as a reference to place the blocks for all remaining levels.
Refer to the illustrations on the following pages to guide you through each step. Prior to adhering
each level to the previously laid block, place the entire level of blocks and check to make sure the
re pit insert ts properly. Remove small sections at a time to place the adhesive.
Once all levels are complete, position the insert into the nished pit. Wait a minimum of two days
before starting a re.
INSTALLATION INSTRUCTIONS
* Do not over apply adhesive. It may reduce effectiveness.
Use mineral spirits to remove any unwanted adhesive.
1’-2
36” Interior Diameter