Installation Instruction
Table Of Contents
- Contents
- IMPORTANT SAFETY INSTRUCTIONS
- Caring for the environment
- How to save energy
- Guide to the appliance
- Accessories
- Before first use
- Switching on and off
- The correct temperature
- Using Automatic SuperCool and SuperFreeze
- Temperature and door alarm
- Selecting additional settings
- Storing food in the refrigerator section
- Adjusting the interior fittings (refrigerator section)
- Freezing and storing food
- Making ice cubes
- Defrosting
- Cleaning and care
- Frequently Asked Questions
- Causes of noises
- Technical Service
- Water connection
- Electrical connection
- Installation
- Changing the door hinges
- Removing the door handles
- Removing the upper soft-close mechanism
- Removing the upper appliance door
- Removing the lower soft-close mechanism
- Removing the lower appliance door
- Refitting the lower appliance door
- Inserting the lower soft-close mechanism
- Refitting the upper appliance door
- Inserting the upper soft-close mechanism
- Refitting the handle
- Aligning the machine doors
Changing the door hinges
80
Push the pin up and out from be-
low using a flat-headed screwdriver.
Remove the cover.
Now the soft-close mechanism and the
machine are no longer connected.
Remove the panel.
Push the soft-close mechanism
bracket as far as it will go toward
the handle side.
Loosen the screw in the soft-close
mechanism and spacer.
Lever out the casing together with the
soft-close mechanism using a flat-
headed screwdriver in the middle.
Then, lever the casing together with
the soft-close mechanism out of the
latch from the machine side.
Put the soft-close mechanism to one
side.
Push the spacer toward the hinge
side and out.
Place the spacer to one side.