Building Instructions

CVA610 Coffee System – List of Figures (Continued)
4-24 Electronic Board (Layout) 39
5-1 Lid and Securing Screws 41
5-2 Mains Filter Mounting 41
5-3 Rear Panel Removal 42
5-4 Removing the Slide Switch Frame 43
5-5 Door Switch 44
5-6 Base Plate Removal 45
5-7 Drip Tray 46
5-8 Overflow Switch Float 47
5-9 Overflow Switch 48
5-10 Fluorescent Lamp Access and Removal 49
5-11 Starter Removal 49
5-12 Rear Door Panel Removal 50
5-13 Fascia Panel Cover Assembly 51
5-14 Selector Switch 52
5-15 Rear View of Front Door w/ Panel Removed 53
5-16 Coffee Dispensing Components 54
5-17 Steam Valve and Steam Valve Switch 56
5-18 Hot Water Valve 57
5-19 Brew Unit Connection Socket 60
5-20 Brew Unit Connection Socket Retaining 60
5-21 Brew Unit Removal 61
5-22 Brew Unit Installation 62
5-23 Cleaning Tablet being placed into brew unit 63
5-24 Brew Unit – lubrication points (1) 65
5-25 Brew Unit – lubrication points (2) 65
5-26 Moving the Brew Unit to the home position 66
5-27 Brew Unit in reset position 66
5-28 Brew Unit (output and retaining lugs) 67
5-29 Rear of Brew Unit 68
5-30 Front of Brew Unit 68
5-31 Brew Unit Ram 69
5-32 Brew Unit Chamber 70
5-33 Brew Unit Ram and Filter Removed 70
5-34 Removing cap to tank float 71
5-35 Levering off the Lip Seal Cap 72
5-36 Removing the Lip Seal 72
5-37 Water Tank Lip Seal – Removal 73