Operating Instructions and Installation Instructions

Building-in dimensions
182
Cut-outs for ventilation and plumbing hoses
a
Cut-out in top of unit (ventilation)
b
Cut-out in the interim shelf at the top of the building-in niche (for ventilation)
c
Cut-out in the interim shelf at the bottom of the building-in niche (plumbing)
d
Cut-out in unit floor (plumbing)