Technical information

Technical Information
92
G1000 / G2000 Dishwashers
appliance.
Refer to Figure 5-30, as directed.
Important
During reassembly of the circulation pump ensure:
1. A new sealing ring is installed
2. The sealing ring is seated correctly in the pump housing cap
3. The pump housing cap is evenly seated
4. The cap retaining screws are secure
5. The fastening clips are pressed over the retaining lugs
5.4.15.1 Pump Cap Removal / Heater Element – Access
1. Remove the cap retaining screws.
2. Release the retaining clips by pushing the clip to the side, while pressing down
the cap.
3. Lightly twist the cover and pull away from the housing to remove.
5.4.15.2 Slide Shutter Removal
1. Circulation pump removal (5.4.14).
2. Heater Pressure Switch removal (5.4.15.7).
3. Pump housing cap removal (5.4.15.1).