Operating and Installation Instructions
Table Of Contents
- Contents
- IMPORTANT SAFETY INSTRUCTIONS 4
- Guide to the Fridge-Freezer combination 7
- Before use 9
- Settings 10
- Temperature and door alarm 13
- Setting the temperature 14
- SmartFresh drawers 16
- Using the refrigerator efficiently 18
- Using the freezer efficiently 19
- SuperCool 21
- Ice cube maker 22
- Automatic defrost 23
- Adjusting the interior fittings 24
- Cleaning and care 28
- Water filter 33
- Lead free certificate 38
- Frequently asked questions 39
- After sales service 47
- Caring for the environment 50
- Installation 51
- Dimensions 56
- Installing the appliance 59
- Plumbing 77
- Electrical connection 80
- RemoteVision (optional accessory) 81

Base
A fully loaded appliance is very heavy.
The load-bearing capacity of your floor
must meet the following requirements:
KF 18X1 Vi .........950lbs(431 kg)
KF 19X1 Vi .......1,185 lbs (537 kg)
To ensure that the appliance is installed
securely and functions properly, the
base must be flat, level and made of a
hard, rigid material.
If in doubt, contact Miele.
Furniture/fixtures
The new appliance will be mounted
securely to adjacent and overhead
furniture/fixtures.
For this reason, it is essential that all
attachable furniture/fixtures be
connected securely to the floor or wall
by a suitable means.
Ventilation
The air intake and outlet must not be
blocked or covered in any way. They
also need to be dusted/cleaned on a
regular basis.
Installation niche
To ensure safe, trouble-free installation
and the best possible cosmetic result,
check to be sure that the installation
space complies with the installation
dimensions. See "Niche dimensions".
The side walls of the installation cavity
must be plumb.
The minimum thickness of the side
walls and the top wall must be 5/8"
(16 mm).
The minimum thickness of the toe-kick
panel must be ½" (13 mm). A thickness
of
3
/
4
" (19 mm) is recommended.
Installation
52