Setting up a payment system
If you wish to set up a payment system,
read the “Payment system” section of
the “Supervisor level” chapter. These
settings can only be changed during
the initial commissioning process. If you
wish to change the settings after the
commissioning process, please contact
Miele Technical Service.
If you do not wish to set up a payment
system, you can skip this stage.
11:02
No payment
system
Payment system
OK
Program
control
Timed
operation
Timed op. +
impul. counter
KOM module
Touch the No payment systemsensor
control.
The display will change to the next
setting.
Completing the commissioning
process
The commissioning process is
complete when a program lasting
longer than 20minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying program (e.g., if
the machine is switched off with the
button), the initial commissioning
process can be completed again.
Once a drying program has been
running for over 20minutes, the initial
commissioning process cannot be
performed again.
Confirm with OK.
In the main menu, touch
theProgramssensor control.
11:02
Automatic
plus
Timed drying
warm air
Basket - Low
temperature
Microfiber
Timed drying
cool air
Basket
program
Programs
Select the Timed drying cool air
program.
Touch the Durationsensor control.
OK
00 20
02 59
01 58
01 21
02 22
Duration
h
11:02
Reset
Place your finger on the number that
you want to change and move your
finger in the direction you want.
Select a duration of 20minutes.
Confirm with OK.
Touch the flashing Start/Stopsensor
control.
After this program has finished, the