Operating and Installation Instructions
Table Of Contents
- Contents
- Caring for the environment
- IMPORTANT SAFETY INSTRUCTIONS
- Operating the tumble dryer
- Initial commissioning
- 1. Notes on correct laundry care
- 2. Loading the tumble dryer
- 3. Selecting a program
- 4. Selecting program settings
- 5. Starting a program
- 6. End of program – removing the laundry
- Timer
- Program chart
- Changing the program sequence
- Fragrance flacon
- Cleaning and care
- Frequently Asked Questions
- Technical Service
- MIELE
- IMPORTANT SAFETY INSTRUCTIONS
- Installation and connection
- Technical data
- Supervisor level
Initial commissioning
25
Completing the commissioning
process
The commissioning process is
complete when a program lasting
longer than 20minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying program (e.g., if
the machine is switched off with the
button), the initial commissioning
process can be completed again.
Once a drying program has been
running for over 20minutes, the initial
commissioning process cannot be
performed again.
Confirm with OK.
In the main menu, touch
theProgramssensor control.
11:02
Automatic
plus
Timed drying
warm air
Basket - Low
temperature
Microfiber
Timed drying
cool air
Basket
program
Programs
Select the Timed drying cool air
program.
Touch the Durationsensor control.
OK
00 20
02 59
01 58
01 21
02 22
Duration
h
11:02
Reset
Place your finger on the number that
you want to change and move your
finger in the direction you want.
Select a duration of 20minutes.
Confirm with OK.
Touch the flashing Start/Stopsensor
control.
After this program has finished, the
tumble dryer is ready for use.