Operation Manual

Payment system
Opening the door or cancelling the programme
after it has started may cause loss of credit
(depending on how the machine was set up*).
* Either during the commissioning process or
subsequently, a Miele service technician can re-set
the payment system so that programming changes
can be made.
Changing a programme once it has
started
You cannot change to another programme once a
programme has started (this prevents unintentional
alterations).
You will need to cancel the current programme
before you can select a new one.
Cancelling the current programme
^
Press shortcut button G Cancel.
On some programmes, laundry will be cooled
down if a certain temperature has been reached.
If short cutt button G Cancel is pressed again,
Finish appears in the display.
^ Open the drum door.
^ Close the drum door.
^ Immediately select the programme you want, and
then start it.
Adding or removing laundry after a
programme has started
,
The laundry, the drum and the back of the
machine all become very hot during operation.
Take care when in the vicinity of the machine,
when opening the door and handling freshly dried
laundry. Danger of burning.
^
Press shortcut button G Cancel.
On some programmes, laundry will be cooled
down if a certain temperature has been reached.
^
Only open the door once the laundry has cooled
down completely.
^
Add or remove items as required.
^
Close the drum door.
^
Select a programme.
^
Press the Start button.
Power cuts
If the dryer is switched off during a drying
programme or there has been a power cut:
^
When the power is restored and/or the machine is
switched on again, confirm with OK and start the
programme again.
Time remaining
The time left shown in the display may now vary from
the actual drying time.
Peak load cut-out (optional)
If the peak load cut-out function is activated the
heating will switch itself off and any programme
running will be stopped.
Once the peak load has finished the programme will
continue automatically as before.
If the door is opened during the peak load cut-out the
programme will have to be started again.
Changing the programme sequence
15