Operation Manual

Levelling the machine
This machine does not require a plinth. However,
make sure that any uneven areas of the floor are
made level.
The machine must be perfectly level to ensure that it
functions correctly.
The screw feet A can be adjusted to align the
machine.
After aligning the machine correctly you need to use
a screwdriver to secure discs B to the floor plate.
Installation on a raised plinth
The dryer can be installed on a raised concrete
plinth.
,
If the machine is installed on an on-site
concrete or brick plinth, it must be secured using
the fixing brackets supplied. Otherwise there is the
danger of the machine moving about.
^
Secure the front feet of the machine with the
clamps supplied.
^
Follow the fitting instructions supplied.
Reducing the noise level
This dryer is fitted with an exhaust fan which can be
heard during operation.
If this noise disturbs you it is possible to fit a silencer
(available from Miele as an optional accessory) into
the dryer's exhaust duct (see Installation instructions).
Coin mechanism
This dryer can be fitted with a coin mechanism.*
To do so a suitable adapter* is required. The machine
also has to be reprogrammed by a Miele trained
service technician.
* available from your Miele Dealer or the Miele Spare
Parts Department.
Empty the coin box every day. This prevents too
many coins or tokens collecting in the coin box,
which could lead to the machine breaking down.
Communication module XKM RS232
This machine can fitted with a communication module
which enables it to be linked to a PC via a serial
interface.
The shaft for the communication module is located on
the rear of the machine.
An editor programme is available from Miele.
Installation and connection
33