Installation plan Tumble dryers PT 8407 HW PT 8807 HW Always read operating and installation instructions before Installation and Commissioning. This is for the protection of yourself and your machine.
en – US PT 8407 / 8807 Legend: Connection optional or required, depending on model Connection required AL Vent connection HWV Hot water valve AM Connection module PA Equi-potential bonding B Machine anchors RL Hot water return feed EL Electrical connection VL Hot water feed F Adjustable machine feet XKM Communication module ZL Air supply connection HWA Hot water valve, connection All rights reserved! 2 09 958 410 / 00
en – US PT 8407 / 8807 Machine dimensions PT 8407 HW 09 958 410 / 00 ( me a s u r e m e n t s i n mi l l i me t e r s ) 3
en – US Machine dimensions PT 8407 HW 4 PT 8407 / 8807 ( me a s u r e m e n t s i n i n c h e s ) 09 958 410 / 00
en – US PT 8407 / 8807 Machine dimensions PT 8807 HW 09 958 410 / 00 ( me a s u r e m e n t s i n m i l l i m e t e r s ) 5
en – US Machine dimensions PT 8807 HW 6 PT 8407 / 8807 ( me a s u r e m e n t s i n i n c h e s ) 09 958 410 / 00
en – US PT 8407 / 8807 Technical data PT 8407 HW PT 8807 HW Drum volume l [gal] 400 [105.67] 800 [211.34] Load capacity (load ratio 1:25) kg [lbs] 16 [35.27] 32 [70.55] Load capacity (load ratio 1:32) kg [lbs] 13 [28.66] 25 [55.12] Porthole diameter mm [in] 520 [20.47] 520 [20.47] Door hinge, rehingeable (right/left) Connection data Heater rating / Nominal heat load kW 9.8 12.
en – US PT 8407 / 8807 Technical data PT 8407 HW PT 8807 HW End-of-programme signal Output signal - External air baffle Output signal - Drying fan in operation Payment system connection (BSK) - - Peak-load/energy management connection (BSS) - - Connection modules (AM) Machine feet (F) No. of feet Pcs. 4 4 Machine feet, height-adjustable with thread mm [in] ±10 [±0.39] ±10 [±0.39] Foot diameter mm [in] 25 [0.98] 25 [0.
en – US PT 8407 / 8807 Installation plans and planning notes Installation requirements Electrical connection must be in full compliance with national regulations and guidelines and with relevant local codes. Guidelines issued by power utilities and insurance companies, occupation safety regulations and general good practices apply throughout. The machine should only be installed and commissioned by Miele Service or the trained personnel of an authorised service agent.
en – US The machine is supplied with a cover on the air intake connection. This cover must be removed before connecting the machine to air supply ducting. PT 8407 / 8807 Equipotential bonding materials must be provided on site. Installation and anchoring The machine must be installed on a perfectly flat, horizontal and firm surface able to support the quoted floor loads.