Operating instructions/Installation instructions

Table Of Contents
Initial commissioning
18
Reference to external appli-
ances
A reference to external hardware ap-
pears.
Confirm with the OKsensor control.
Before initial commissioning, connect
the XCI box or slide a communication
module into the slot on the back of the
washing machine. The washing ma-
chine must be disconnected from the
power supply. Then start the commis-
sioning process.
Setting the display brightness
You will be asked to select the bright-
ness of the display.
Display brightness
Darker
Brighter
OK
Touch the segment bars until you
reach the required level of brightness.
The selected brightness level will be
highlighted in orange.
Confirm with OK.
The display will change to the next set-
ting.
Setting the date
OK
Date
2021
2020
2019
25
24
22
21
23July
August
September
June
May
2018
2017
Place your finger on the value that
you want to change and move your
finger in the direction you want.
Once all values have been selected,
confirm with the OKsensor control.
The display will change to the next set-
ting.
Confirming the time request
The following question appears in the
display:
Remove the clock display?
Touch the Yes or Nosensor control.
If you select Yes, the system will skip
the Clock displaysetting.
If you select No, the display will switch
to the Clock displaysetting.