Operating instructions

Installation
1 Cold water inlet hose
blue stripes
(see “Plumbing”)
2 Hot water inlet hose
red stripes
(see “Plumbing”)
3 Electrical connection
(see next pages)
4 Coin mechanism (optional)
5 Small panel with text
(see p.5 for insertion)
6 Drain hose for drain pump (LP)
version (see “Plumbing”).
7 Drain hose for drain valve (AV)
version (see “Plumbing”).
8 Concrete plinth - on site
Steel plinth available on request
(Secure floor connection required)
9 Hexagonal M10 nut.
10 Butt strap
11 Screw and washer, plug 8 x 40
When installing on a ’floating’ floor,
use the appropriate fixing kit, (plugs
and screws).
39