Installation Guide

2 3
Before You Start
The installation has two parts ...
• Mounting The Lock and Control Box
• Mounting The Keypad
Once you have the necessary wire and mounting hardware, you are
ready to begin the installation.
Materials you will need before you begin the installation.
For all installations use mounting hardware (not included) no greater than 5/16” diameter.
Note: for a more secure installation, we suggest you use lock washers and/or lock nuts on
all mounting hardware.
For most IRON and ALUMINUM TUBE gates (see Illustration C, page 6) use bolts, wash-
ers, and nuts to mount both the lock and the receiver.
For most CHAIN LINK gates (see Illustration D, page 6) use U-Bolts and saddles to mount
the lock, and use bolts, washers, and nuts to mount the receiver.
Other materials you may need before you begin the installation:
If mounting Bulldog lock on brick columns, walls, or other applications with limited space
between gate and post use the Column Mount Lock Receiver.
Use PVC conduit for protection of low voltage wire connecting the control box to battery
charger and entry control (see Illustration A, page 5).
The push button is included with your Bulldog Gate Lock for entry control. However, other
devices (card readers, keypads) with normally open (n/o) contacts may be used. Transmit-
ters are not compatible with this product.