Product Manual B
MM-LPS13 Installation Manual 1
rev 05.16.13
Winter Ratings Watts Zone 1 Zone 2 Zone 3
MM-LPS13 10 4 8 13
MM-LPS13 20 8 16 26
Estimated Maximum Number of Cycles Per Day
BEFORE YOU BEGIN...
1. Determine Charging Option for Battery: Transformer OR Solar
NEVER USE TRANSFORMER AND SOLAR PANEL(S) AT THE SAME TIME.
It will damage the control board.
IMPORTANT:
• TheMM-LPS1312voltbattery
[FM150] must be charged by either connecting the transformer
(included) or solar panel kit
[FM123] to the control board.
• Thetransformerisdesignedforindooruse.Ifthetransformercanbepluggedonlyintoanoutside
electrical outlet, a weatherproof cover/housing (available at local electrical supply stores) must be
used.
• AlllowvoltagewireusedwiththeMightyMuleGateOperatormustbe16gaugedualconductor,
stranded, direct burial wire
[RB509]. Do not run more than 1000 ft. of wire.
•Ifyourgateismorethan1000ft.fromanACpowersource,youwillneedtouseatleast10Watts
solar charging power to charge the battery
[FM123]. Refer to the Solar Panel and Gate Activity
chart below.
•Two12voltbatteries
[FM150] are required for the MM-LPS13 to run on solar power.
(see accessories on page 24)
The table and map
illustrate the maximum
number of gate cycles
to expect per day in a
particular area when
using from 10 to 20 Watts
of solar charging power.
The gures shown are
for winter (minimum
sunlight).
Accessories connected to your system
will draw additional power from
the battery.
NOTE: A minimum of 10 Watts, maximum
of 20 Watts charging power is needed to
charge the two batteries.
10 Watt Solar Panel [FM123]
5 Watt Solar Panel [FM121]
Solar Panel and Gate Activity Chart