Product Manual B

MM-LPS13 Installation Manual 23
rev 05.16.13
MAINTENANCE
Routine Maintenance:
•Testtheoperator,accessories,andsafetydevicesmonthly.
•Servicethegateoperator,accessories,andsafetydevicesregularly.
Maintenance Checklist
•Testthesafetydevicestomakesurethegateresponds.
•Checktheobstructionsettings(bothopenandclosemodes)seepage15.
•Lubricateandadjustthechainwhennecessary.
•Checkforwearonallmovingparts,andtightenboltsasnecessary.
•Checkrollersonthegateandlubricateifneeded.
•Checkforlooseorcorrodedwires.
•Makesurethewarningsigns,rollerguards,fencescreen,etc.(seepagevi)areinstalled.
WARNING: ALWAYS TURN OPERATOR OFF AND DISCONNECT
AC POWER BEFORE ADJUSTING OR SERVICING IT!
VOLTAGE READINGS
18VacTransformer 18.0to22.0Vac
10WSolarpanel(single) 18.0to22.0Vdc
In FULL SUN — measure voltage with the Solar Panel Disconnected.
12V,7amphourBattery 12.5to13.5Vdc
Measure voltage at battery terminals with battery disconnected
Chargingcircuit 12.0to14.8Vdc
Measure voltage at battery terminals with battery connected