Installation Guide

2 MM371W / MM372W Installation Instructions MM371W / MM372W Installation Instructions 3
G
L
O
F
G
V
T
S
F
B
S
E
N
!
G
L
O
F
G
T
Minimum 80˚ Open
N
S
F
B
S
E
N
!
G
L
O
F
G
T
N
PULL-TO-OPEN OPERATOR MOUNTING
(
MOST COMMON
)
PULL-TO-OPEN OPERATOR MOUNTING
Assemble the gate post bracket sub
assembly as displayed.
Attach the gate post bracket
subassembly and gate bracket to the
operator as shown.
Disconnect the operator arm from
the gate bracket.
While supporting the operator,
swing the gate and operator to the
closed position.
Check for recommended
clearances and binding as shown.
Ensure that the necessary arm
stroke does not exceed 17 inches.
Make adjustments to the
mounting brackets to achieve the
recommended clearances.
TIP: Turning the pivot bracket over
gives more hole alignment options
for the gate post pivot bracket
assembly.
With the gate in the OPEN
position, use clamps to secure
the operator to the gate post and
center cross member of the gate.
Ensure that the operator is level.
With the operator arm temporarily
secured to the gate, check
to ensure there is at least 2
inches of clearance between
the operator arm and gate. (See
illustration in Step 4 below).
2" Min. - Pinch-Point Clearance
Top View
2" Min.
17" MAX.
2
1
Closed
Position
Open
Position
Step 1
Step 2
Step 3
Step 4
Your Property Your Property