Product Manual

20 MM562 Installation Instructions
Step 5
Twist each end of the gate opener power cable’s 7 colored wires. Feed cables through strain relief sealing nuts.
Feed cables through the strain relief bushing into control box. Pull enough cable into the control box to easily reach the
Master and Second Operator terminals (6" or so ). Secure cables by tightening the sealing nut.
Running Power Cables Into Control Box
Step 4
Review the Installation Overview illustration on page 9 before proceeding.
Cut a 6" deep slot into the driveway to accommodate PVC conduit (not provided) for the power cable coming from the
Second opener to the control box. The buried conduit will protect the 32 foot power cable from automobile tires, lawn mower
blades, weed eaters, and grazing animals. Pull the second opener power cable through the conduit and secure them into the
slot in the driveway.
15
FUSE
BAT T+
BAT T-
1 2 3 4
ON
STAT US
LEARN RMT
RECEIVER
LEARN
MAST LIMIT
LEARN
SLV LIMIT
S3
S4
ALM
S2
OFF
SOFT START OFF
WARNING OFF
OPEN PULL
SLV OPEN DLY.
MODE1 OFF
MODE2 OFF
ON
ON
PUSH
SIMULT.
ON
ON
120 MIN MAX
GTO RCVR.
WHT
BLU
BRN
ORG
RED
BLK
GRN
WHT
BLU
BRN
ORG
RED
BLK
GRN
COM
GRN
BLK
RED
CYCLE
SAFETY
EXIT
SHADOW
OPEN
EDGE
COM
AUX
R LY
MASTER CABLESECOND CABLE
CONTROL INPUTS
AUTO CLOSE TIME STALL FORCE
CLOSE
EDGE
GTO
LOCK
AUX
6”
SECURE SEALING NUTS
SEALING NUT
500
UL325 SERIES
®
E-Z GATE OPENER
1-800-543-GATE (4283)
www.mightymule.com
Second gate opener
Master gate opener
Run PVC conduit (not included) under driveway to protect
second opener power cable and low voltage wire.