Instructions / Assembly
11
Hang operator with two
5/16”-18 x 1” bolts and nuts
DOOR
RAIL
2”
Attach opener to hanging brackets using two
5/16”-18 x 1” hex bolts and two 5/16”-18 keps
nuts (supplied).
Open and close the door manually. The door
should clear the rail by at least 2”.
76
Joist under
sheet rock.
Diagonal supoport
for added stability.
Diagonal supoport
for added stability.
IMPORTANT: On a nished ceiling, be sure there
is a joist to fasten to under the sheet rock where
the cross piece will be located (use a stud nder).
If there is none, install a 2”x4” cross piece of wood
between the two closest joists to fasten the head
bracket hardware to.
For un nished ceilings: Hold each angle iron in
place, mark and drill 3/16” pilot holes, then attach
with two 5/16” x 1-1/2” lag screws (supplied).
For nished ceilings use an angle iron cross piece,
secured into ceiling joist with 5/16” x 1-1/2” lag
screws. Attach the two hanging brackets to the
cross piece with two 5/16”-18x1” hex bolts and
5/16”-18 nuts.
For additional stability add a diagonal support
piece of angle iron and secure with 5/16”-18x1”
hex bolts and 5/16”-18 nuts.
NOTE: Installation requirements vary with garage
construction. Hanging brackets should be angled
to provide rigid support. Not all hanging material is
provided.
4 5
5/16”x 1-1/2” Lag Screw 5/16”-18 x 1" Bolt 5/16”-18 Keps Nut
HARDWARE SUPPLIED
Angle Iron
1D
1D
1D
2F
2F
2F
2G
2G
2G