Instructions / Assembly
5
5/16”-18 x 3/4" Bolt Grease Tube
5/16”-18 Keps Nut
1/4”-20 x 1/2" Flange Bolt
1/4”-20 Keps Nut
1D 1E 1G 1H
1M
SLIDE THE TROLLEY
ONTO RAIL SECTION “A”
PULLEY
HOLES
PUT NUTS ON BOLTS
WITH JUST A FEW TURNS,
DO NOT TIGHTEN NUTS
AT THIS TIME.
2 3
Slide the Trolley onto the rail Sections “A”. Be sure
of proper trolley orientation.
Attach the Pulley Assembly to rail Section “A” with
(2) 5/16”-18 x 3/4” bolts and (2) 5/16”-18 Keps nuts
(supplied). DO NOT FULLY TIGHTEN AT THIS TIME.
SECTION “C”
SPROCKET
FLAT SIDE UP
SPROCKET
HOLDER
APPLY
GREASE
APPLY GREASE
SECTION “C”
SECTION “C”
4
5
Install trolley stop using 1/4”-20 x 1/2” Flange
bolt and 1/4”-20 keps nut (supplied).
Apply grease to inside surfaces of sprocket holder
as shown and place the Sprocket into the sprocket
holder with at side up, then place Sprocket Holder
onto rail Section “C”, as shown.
HARDWARE
RAIL ASSEMBLY – continued
Completed rail assembly.
1G
1H
1E
1D
1M










