User Manual
Table Of Contents
- About This Guide
- Introduction
- Kit Installation
- iB-5209 Network Monitor Operations
- iB-5209 Network Monitor Overview
- Setting Thread Priority
- Configuring a Node’s Operation
- Using Watch function to display current I/O information
- Configuring Sample Interval of Single Node
- Configuring Sample Interval of all Network Nodes
- Configuring Digital I/O Operation
- Configuring UART Operation
- Configuring AD (analog-to-digital) Converter Operation
- Configuring RS-232 Operation (RT-5209 only)
- Configuring RS-485 Operation (RT-5209 only)
- Labeling i-Bean Endpoint or i-Bean Router
- Creating an Event Log File
- Configure Persistence Attributes
- Configure Serial and ADC Data Formats
- Select Com Port on Host PC
- View Monitor Statistics
- View Contents of Event Log File
- Enable Multiple Capture
- API Functions
- Sample Application
B-4 EK-5209-5 Evaluation Kit User’s Guide
Application Setup & Operation
The following procedures describe how to set up the iB-5209 hardware and software for
creating the evaluation kit’s sample application.
Temperature Sensor Assembly Setup
To install an i-Bean Endpoint in the temperature sensor assembly (see Figure B-3):
1. Use an Allen wrench to turn in the two set screws holding the cover to the base and
remove the cover.
2. Turn the Power Switch OFF.
3. Remove an i-Bean Endpoint from one of the kit’s terminal boards and install it on the
terminal board located on the base of the temperature sensor assembly.
4. Turn the Power Switch to ON. The sensor is discovered and displayed by iB-5209
Network Monitor.
5. Replace the cover and back out the two cover set screws to secure the cover in place.
Figure B-3. Installing i-Bean Endpoint in Temperature Sensor Assembly
Note:
Before this sample application can be executed, you must install the iB-5209
Evaluation Kit’s hardware and software according to the instructions found in
Chapter 2, “Kit Installation”. The i-Bean Gateway must be installed and powered
on, and iB-5209 Network Monitor must be running before proceeding.
Install i-Bean Endpoint
3
Turn Power Switch ON
4
Turn Power Switch OFF
2
Replace cover
5
Turn in cover set screws (2),
1
then remove cover