User Manual

Table Of Contents
2-10 Millennial Net
Installing the MeshScape System
7. Turn the Power Switch ON. The mesh node is ready to operate as a router device (see
note below). For information on the behavior of the status LEDs, see
Table 2-3 on page
2-8.
8. Replace the cover and secure in place with the four philips head screws.
Figure 2-8.Installing mesh node battery pack
Accessing I/O connections
Figure 2-9 on page 2-11 provides a mapping of the various I/O connections available on the
mesh node. To run a cable to an I/O connector, a punch-out is provided on the bottom of the
case (to the right of the battery pack shown in
Figure 2-8 above).
To access the mesh node’s I/O connectors:
Note:
C
For information on accessing and using the mesh node internal I/O connections for
interfacing with an external device see
’Accessing I/O connections’ on page 2-10.
Cover and Cover Screws (4)
AC Adapter Cable
(remove)
Power Switch
Battery Pack with 2
Mounting Screws
(install)
Connector SL1
Product Label with:
- Model Number
- GroupID
- Device ID