Specifications
3.6
Coflnectingî‚’WeId
Cabtes
And
Gas
Hoses
The
weld
cable
and
shielding
gas
hose
extend
10
ft
(3
m)
from
the
boom.
Route
weld
cable
from
boom
through
reed
relay,
if
applicable.
If
the
welding
power
source
or
gas
supply
are
further
from
the
boom,
extend
cable
or
hose
as
follows:
1
Weld
Cable
2
Insulated
Sleeving
Bolt
together
weld
cables
from
welding
power
source
and
boom.
Use
electrical
tape
and
insulated
sleeving
to
cover
connection.
3
Shielding
Gas
Hose
Connect
hose
to
gas
supply
or
ex
tension
hose.
The
hose
from
the
boom
has
5/8-18
right-hand
threads.
Tools
Needed:
~
518
in
Ref.
ST-801
805/
Ref.
ST-152
800-A
OM-1
586
11