System information

SECTION FOUR - PREPARATORY FUNCTIONS (G CODES)
High speed peck drilling cycle (G73)
G73 G98/G99 Z___ R___ V___ Q___ U___ D___ F___
The G73 command specifies the high speed peck cycle. This cycle will do the following.
1. Rapids to point R
2. Feeds down to point V
3. Rapids up U value
4. Rapids down to D value
5. Feeds down by Q value or Z point (whichever is less)
6. Repeat steps 3-5 until point Z is reached
7. Rapids to initial point/point R as determined by G98/G99
Note: The V command is optional. If left out, the first depth would equal R___ - Q___.
275