User Manual

Note
Connect each pair of wires to the respective terminals; note the
connections for future reference.
4) Close the unit's box cover.
5) Perform functional radio test by touching box corner with strong magnet
(trigger transmission). Verify correct reception of data at base station
(concentrator). Update water actual readings for the respective meter.
6) Close the four screws fastening the cover.
7) Insert plastic protection plugs.
Figure 4-1: Speed HPTx - Pipeline Installation