Service Parts List

Bluetooth Board
Worklight LED
Pressure Indicator
Bluetooth Light
Control Board
Hall Board
Dump
Switch
Main
Switch
Bluetooth
Light
Main
Switch
Pressure
Indicator
Control Board
Bluetooth Board
Coin Cell Battery
Dump Switch
Pressure
Sensor
Coin Cell
Worklight LED
Battery
Terminal Block
As an aid to reassembly, take notice of wire routings and
position in wire guides and traps while dismantling tool.
Be sure that all components of electronics kit are seated firmly and squarely in housing recesses.
Avoid pinched wires, be sure that all wires and sleeves are pressed completely down in wire traps.
Prior to securing housing cover onto the housing support, be sure that there are no interferences.
Before installing the battery, check for proper functionality of shuttles and triggers.
Install battery and depress switch triggers to assure tool is operating properly.
Ground Screw (44) secures to
Pump Body here
Coin Cell
Pay close attention to the position of the ear
clamp lugs that secure the front and rear of
the bladder. See page 6 for additional
reference.