User's Manual

Personal Node User Manual
47 / 70
Rev: 1.1
©
c
Minete
01
2
9
Step
Action/Response
Comments
4) Prepare the
wall or
frame.
Install the using the EzyStrut E4000 Ribbed
Channel, 41x21mm or equivalent.
Ensure that the channel is fixed to the wall with
appropriate fixings that are:
Suitable for the type of wall.
Spaced to support the load.
See Figure 17 Wall mounted -
front and Figure 18 Wall
mounted - side on page 40
showing the 'T' type bracket
(yellow), EzyStrut E4000
channel (red) and spring nuts
(orange).
Table 12 Dock weights on page
42.
Table 13 EzyStrut E4000 loads
on page 42
5) Locate the
dock
position.
Mark the channel at two points 467 mm apart.
The dock will be centred
between these marks. See
Figure 15 Dock horizontal view
and spacing (mm) on page 39.
6) Insert
channel
nuts
At each mark on the channel:
Insert channel spring nut with the spring
towards the channel base and the nut
horizontal.
Push the nut into the channel compressing
the spring.
Rotate the nut 90° clockwise to a vertical
orientation.
Release the pressure on the spring, the nut
is located within the channel.
If necessary, slide the nuts to align with the
original locating marks.
Channel spring nut
7) Insert
mounting
screws
Partially screw the pan head bolts into the
channel spring nuts.
Leave enough space behind
the heads to accept the
bracket thickness.
8) Hang the
dock.
Lift the dock and align the large aperture (13
mm diam.) of the keyholes to the channel
nuts.
Place the keyhole larger aperture over the
protruding pan head bolts.
Lower the dock so that the small aperture
(7.5 mm diam.) sits on the pan head bolts.