Personal Node User Manual Section 8 Maintenance activities
55 / 70
Rev: 1.1
©
c
Minete
01
2
9
• Planning approval and permit to work documents per operational and HSE.
• All required hardware and cabling is available.
• Positive electrical isolation using site 'lock out tag out' system (eg padlock isolators).
• Appropriate PPE.
Before commencing any electrical work, ensure that:
• You have read and understood the Safety on page ii.
• All electrical work to be done by qualified, authorised and deemed competent persons.
• The work area is clear and free from hazards.
• All relevant onsite permissions and permits to work have been obtained.
• Power is isolated, as per site operational and HSE procedures.
• All safety precautions are in line with Mine Operator policy for working on electrical items.
• All required hardware and cabling is available.
• If operating in sub-zero temperatures, also see Cold weather operation on page 61.