User's Manual

Personal Node User Manual Section 8 Maintenance activities
Rev: 1.1 59 / 70
©
Minetec 2019
The following steps to be performed by qualified
electrican.
15)
Restore power
De-isolate power supply.
Follow on-site operational and HSE
practises to de-isolate the power supply.
Unplug from supply or isolate
power if hardwired to supply.
16)
Check Power LED
Check power LED is on when power restored.
Refer to the site corrective maintenance
procedures.