Instruction manual
47
XI. BUILDING THE TAIL BOOM ASSEMBLY, BOOM SUPPORTS, AND INSTALLATION ONTO THE
MAIN MECHANICS
Bags required: 11A through 11D
Tools or materials required:
M1.5 and 2.5 Allen tools
M5.5 (7/32@) flat wrench
Small pliers
Small straight blade and Phillips screw drivers
Hand drill with 1.30mm (.055@) drill bit
Heat gun
AJ-B Weld@ epoxy or similar slow cure epoxy, slow Cyanoacrylate glue (CA) and silicone glue
Small piece of 180 - 22- grit sandpaper
Light oil or Vaseline petroleum jelly.
Step 1: Installing the Tube Drive, Push Rod Guides, and Fins
Parts Required Bag #
8 #0003 M3 flat washers (large) 11B
2 #0006 M2.5 Atoothed@ lock washers 11B
4 #0015 M2 hex nuts 11B
5 #0019 M3 hex locknut 11B
1 #0024 M2.2 x 4.5 Phillips self tapping screw 11B
2 #0027 M2.2 x 9.5 Phillips self tapping screw 11B
5 #0032 M2.9 x 9.5 Phillips self tapping screw 11B
2 #0043 M2 x 10 slotted machine screw 11B
2 #0044 M2 x 12 slotted machine screw 11B
1 #0063 M3 x 10 Socket Head Bolts 11B
4 #0077 M3 x 30 Socket Head Bolts 11B
2 #0186 Front tail boom clamp halves 11B
2 #0477 Push rod guide support 11B
1 #0683 Tail rotor gearbox clamp 11B
2 #0800-5 O-rings 11B
2 #0868-5 Push rod guides 11B
1 #0870-1 Horizontal fin mount 11B
1 #0587-14 Graphite Tail Boom Ultra 33@ 11A
1 #0867-15 Heavy Duty Torque Tube Assembly 11A
1 #0589-4 Horizontal Fin 11A
1 #0589-5 Vertical Fin 11A
Refer to Drawings #11A
, #11B, and #11B-1
A. Select the #0867-15 Heavy Duty Torque Tube Assembly. The ball bearings at the center are surrounded by
plastic housings which require the addition of two O-rings #0800-5. Select and install these O-rings. Apply a
light coat of oil or Vaseline lubricant and slide the assembly into the #0587-14 Tail Boom.
B. Slide one #0870-1 Horizontal Fin Mount onto the rear (notched end) of the tail boom, positioning it
approximately 175mm from the end