Installation Sheet

ASSEMBLING THE FIXTURE (FIG. 1)
1. Shut off the power at the fuse box or circuit breaker. If
necessary, remove the old fixture from the ceiling, including
the existing mounting hardware.
2. Carefully remove the new fixture from the carton and check
that all parts are included as shown in the illustration.
3. Thread the nipple (X) into the coupling (Z) and secure with
hex nut;
4. Put the tube (Y), check ring (V), canopy (D), Flat washer (U),
lock washer (T) onto the nipple (X) in order, then secure with
hex nut (S) tightly;
5. Thread the nipple (H) into the coupling (G) and secure with
hex nut.
6. Install the bulbs in accordance with the fixture’s specifications.
(DO NOT EXCEED THE MAXIMUM WATTAGE RATING!)
(NE PAS DEPASSER LA PUISSANCE NOMINALE
MAXIMALE!).
7. Insert the tube (I), check cover (J), flat washer (K), rubber
washer (L), glass diffuser (M), rubber washer (N), flat washer
(O) over the nipple (H) and secure with hex nut (R) until snug.
8. Insert the cap (P) over the nipple (H) and secure with finial
(Q).
MOUNTING THE FIXTURE
9. Attach the cross bar (B) to the outlet box using the outlet box
screws (A). The side of the cross bar marked “GND” must
face out.
10. Raise the fixture body to the outlet box.
CONNECTING THE WIRES (FIG .2)
1.
At this point, connect the electrical wires as shown in Fig. 2,
making sure that all wire connectors are secured. If your outlet
box has a ground wire (green or bare copper), connect the
fixture’s ground wire to it. Otherwise, connect the fixture’s
ground wire directly to the mounting plate using the green
screw provided. After wires are connected, tuck them carefully
inside the Junction Box.
2.
Attach the fixture body onto the outlet box by protruding
mounting screws(C) through mounting holes on the canopy (D)
and secure with ball nuts (E).
Your installation is now complete. Return power to the outlet box
and test the fixture.
Fig.1
BALL NUT(E)
COUPLING(G)
TUBE(I)
CHECK COVER(J)
RUBBER WASHER(L)
FABRIC SHADE(F)
FLAT WASHER(O)
GLASS DIFFUSER(M)
HEX NUT(R)
CAP(P)
FINIAL(Q)
NIPPLE WITH HEX
NUT(H)
MOUNTING SCREWS(C)
CANOPY(D)
RUBBER WASHER(N)
FLAT WASHER(K)
HEX NUT(S)
FLAT WASHER(U)
CHECK RING(V)
NIPPLE WITH HEX NUT(X)
TUBE(Y)
COUPLING(Z)
LOCK WASHER(T)
INSTALLATION INSTRUCTIONS FOR FIXTURE#4107-172/84
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER.
AVERTISSEMENT! COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR.
Set A#A
-
010
-Crossbar
-Ground Screw
-
Mounting screws
(2)

Summary of content (1 pages)