Installation Guide

INSTALLATION INSTRUCTION FOR 4177
WARNING! SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER .
AVERTISSEMENT! COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR.
READ AND SAVE THESE INSTRUCTIONS
PREPARATION
1. Carefully remove the fixture from the carton and
check that all parts are included as shown in the
illustration.
2. Shut off the power at the circuit breaker and
remove old fixture, including the mounting
hardware.
ASSEMBLING THE FIXTURE
3. Place the diffuser (J) onto the fixture body (L).
Then place the small steel sheet (K) of the fixture
body (L) onto the diffuser (J).
4. Place the hook (H) of the rods (G) onto the loop
(I). Then the loop (F) of the rods (G) onto the hook
(E).
MOUNTING THE FIXTURE (Fig.1)
5. Insert junction box screws (A) (Size:#8-32*0.6”L)
into the circular strap (B), Secure circular strap
(B) with junction box screws (A). The side of the
mounting bar marked “GND” must face out.
CONNECTING THE WIRES (Fig. 2)
6. At this point, connect the electrical wires as shown
in Fig. 2, making sure that all wire connectors are
secured. If your outlet box has a ground wire
(green or bare copper), connect the fixture’s ground
wire directly to the mounting plate using the green
screw provided. After the wires are connected,
tuck them carefully inside the outlet box.
COMPLETING THE INSTALLATION
7. Raise the ceiling cap (C) over the circular strap
(B), and then secure it with mounting screws (D)
(Size:#8-32*0.5”L).
8. Install the light bulb(s) in accordance with the
fixture’s specification. (DO NOT EXCEED THE
MAXIMUM WATTAGE RATING!) (NE PAS
DEPASSER LA PUISSANCE NOMINALE
MAXIMALE!).
Your installation is now complete. Return the power
to the junction box and test the fixture.
Fig.1
Set#
-Circular strap
-Ground screw
-Mounting screws*3
-Junction box screws*2
A-024
Fig.2

Summary of content (1 pages)