Service manual
FrameMaker Ver5.5E(PC) CF3102/CF2002 TROUBLESHOOTING
02.06.13
T- 4 1
C004C
C004E
C004F
Step Action
Ref.
Page
WIRING DIAGRAM
Control Signal
Location
(Electrical
Component)
1
Check the motor connector for
proper connection and correct
as necessary.
—— —
2
Check the fan for possible
overload and correct as neces-
sary.
—— —
3 M22 operation check T-3
PWB-IO PJ23IO-15(LOCK)
PWB-IO PJ23IO-14(REM)
19-A
4 Change PWB-IO. —— —
5 Change HV3. ——19-B, C
Step Action
Ref.
Page
WIRING DIAGRAM
Control Signal
Location
(Electrical
Component)
1
Check the motor connector for
proper connection and correct
as necessary.
—— —
2
Check the fan for possible
overload and correct as neces-
sary.
—— —
3 M21 operation check T-3
PU1 PJ12PU1-1(LOCK)
PU1 PJ12PU1-3(REM)
29-I
4 Change PU1. —— —
Step Action
Ref.
Page
WIRING DIAGRAM
Control Signal
Location
(Electrical
Component)
1
Check the motor connector for
proper connection and correct
as necessary.
—— —
2
Check the fan for possible
overload and correct as neces-
sary.
—— —
3 M26 operation check T-3
PWB-IO PJ28IO-9(LOCK)
PWB-IO PJ28IO-7(REM)
35-B
4 Change PWB-IO. —— —