Service manual

LCT
1-Q-6
3 DIS./ASSEMBLY1 DIS./ASSEMBLY
[7] Replacing the A4LCT Up/Down Wires
Caution:
With the power held on, press the LT
tray down switch (SW100) to move the
up/down plate down to the bottom in
advance.
a. Procedure
(1) Open the top cover.
(2) Remove the clutch replacement cover.
(3) Remove five screws to detach the right side
cover.
(4) After opening the jam access door, remove six
screws to detach the front cover.
Caution:
When removing the front cover, close
the jam access door after removing
the screws.
(5) Remove twelve screws to detach the rear cover.
(6) Remove the five relay connectors (CN749,
CN780, CN781, CN782, CN783) to disconnect
the wiring harness from the up/down motor
mounting assembly.
(7) Remove the E-ring to detach the up/down gear.
(8) Pull the pin from the shaft.
(9) Remove the E-ring to detach the bearing.
Right side cover
Screws
Screws
Screws
Screws
Jam access door
Right side cover
Screw
Screws
Screws
Screws
Rear cover