DFCM Bid DA14027 Solicitation DA14027 Corrections-Intercom & Paging System Remodel Draper Prison-13304100 Bid designation: Public DFCM 5/30/2014 2:08 PM p.
DFCM Bid DA14027 Bid DA14027 Corrections-Intercom & Paging System Remodel Draper Prison13304100 Bid Number Bid Title Expected Expenditure DA14027 Corrections-Intercom & Paging System Remodel Draper Prison-13304100 $207,000.00 (This price is expected - not guaranteed) Bid Start Date May 30, 2014 2:05:38 PM MDT Bid End Date Jun 26, 2014 2:30:00 PM MDT Question & Answer End Jun 18, 2014 4:00:00 PM MDT Date Bid Contact Craig Wessman DFCM 801-673-2107 cwessman@utah.
DFCM Bid DA14027 4110 State Office Bldg. Salt Lake City UT 84114 Qty 1 Description Replacement of the existing intercom and paging systems. 5/30/2014 2:08 PM p.
DFCM Bid DA14027 STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES Division of Facilities Construction and Management DFCM MULTI-STEP BIDDING PROCESS FOR CONTRACTORS Request For Solicitation For Construction Services Stage II – Electrical Contractors Bidders List FY2014 May 30, 2014 INTERCOM & PAGING SYSTEM REMODEL DRAPER PRISON WASATCH & OQUIRRH BUILDINGS DEPARTMENT OF CORRECTIONS DRAPER, UTAH DFCM Project No. 13304100 Envision Engineering 244 West 300 North, Ste.
DFCM Bid DA14027 TABLE OF CONTENTS Page # Title Sheet Table of Contents Invitation to Bid Project Description Stage II – Multi-Step Bidding Process Stage II - Project Schedule Bid Bond Instructions and Subcontractors List Form Contractor's Agreement Performance Bond Payment Bond Certificate of Substantial Completion Past Performance Rating Form 1 2 3 4 5 9 10 11 14 19 20 21 Technical Specifications: Drawings: Current copies of the DFCM General Conditions dated May 25, 2005 and all Supplemental General
DFCM Bid DA14027 INVITATION TO BID ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS PROJECT The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project: INTERCOM & PAGING SYSTEM REMODEL DRAPER PRISON WASATCH & OQUIRRH BUILDINGS DEPARTMENT OF CORRECTIONS DFCM PROJECT NO: 13304100 Project Description: Replacement of the intercom equipment in the security cell block areas in multiple locations.
DFCM Bid DA14027 PROJECT DESCRIPTION Contact Information: Project Specific Questions: All questions are to be submitted in writing through BidSync (www.bidsync.com). Refer to Project Schedule for deadline. Bidsync Technical/Bidding Questions: Bidsync Customer Service 801-765-9245 Option 1, Option 1 or www.bidsync.com. DFCM Project Manager: Craig Wessman Phone: 801 673-2107 Project Description: Replacement of the existing intercom and paging systems in two separate buildings.
DFCM Bid DA14027 STAGE II - MULTI-STEP BIDDING PROCESS ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON THIS PROJECT 1. Invitational Bid Procedures Each pre-qualified firm will be notified via e-mail from Bidsync when a project is ready for Construction Services to invite them to bid on the project. 2. Drawings and Specifications and Interpretations Drawings, specifications and other contract documents may be obtained as stated in the Invitation to Bid.
DFCM Bid DA14027 Multi-Step Bidding Process Stage II Page No. 2 7. Licensure The Contractor shall comply with and require all of its Subcontractors to comply with the license laws as required by the State of Utah. 8.
DFCM Bid DA14027 Multi-Step Bidding Process Stage II Page No. 3 B. the contractor provides a bid bond properly signed by a qualified surety and on the required DFCM Bid Bond form by the close of business of the next succeeding business day after the DFCM notifies the bidder of the defective bid bond. A CASHIER’S CHECK CANNOT BE USED AS A SUBSTITUTE FOR A BID BOND. 11.
DFCM Bid DA14027 Multi-Step Bidding Process Stage II Page No. 4 16. DFCM Contractor Performance Rating and Pre-Qualification Status As a contractor completes each project, DFCM will evaluate project performance based on the enclosed “DFCM Contractor Performance Rating” form. The ratings issued on this project may affect the firm’s “pre-qualified” status and their ability to obtain future work with DFCM.
DFCM Bid DA14027 STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES Division of Facilities Construction and Management DFCM Stage II - PROJECT SCHEDULE BIDSYNC BID # DA14027 PROJECT NAME: DFCM PROJECT NO: Event Stage II Bidding Documents Available Background Check Form Submitted to Shawn Anderson at the Dept.
DFCM Bid DA14027 BID BOND (Title 63, Chapter 56, U. C. A. l953, as Amended) KNOW ALL PERSONS BY THESE PRESENTS: That hereinafter referred to as the "Principal," and , a corporation organized and existing under the laws of the State of , with its principal office in the City of ______________ and authorized to transact business in this State and U. S.
DFCM Bid DA14027 STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES Division of Facilities Construction and Management DFCM INSTRUCTION AND SUBCONTRACTORS LIST FORM The three low bidders, as well as all other bidders that desire to be considered, are required by law to submit to DFCM within 24 hours of bid opening a list of ALL first-tier subcontractors, including the subcontractor’s name, bid amount and other information required by Building Board Rule and as stated in these Contract Documents, bas
DFCM Bid DA14027 INSTRUCTIONS AND SUBCONTRACTORS LIST FORM Page No. 2 other reason in the best interest of the State of Utah. Notwithstanding any other provision in these instructions, if there is a good faith error on the sublist form, at the sole discretion of the Director, the Director may provide notice to the contractor and the contractor shall have 24 hours to submit the correction to the Director. If such correction is submitted timely, then the sublist requirements shall be considered met.
DFCM Bid DA14027 STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES Division of Facilities Construction and Management DFCM SUBCONTRACTORS LIST GIFPFRQWUDFWV@utah.gov PROJECT TITLE: Caution: You must read and comply fully with instructions. TYPE OF WORK SUBCONTRACTOR, “SELF” OR “SPECIAL EXCEPTION” SUBCONTRACTOR BID AMOUNT CONT. LICENSE # We certify that: l. This list includes all subcontractors as required by the instructions, including those related to the base bid as well as any alternates.
DFCM Bid DA14027 DFCM Project No. ________ DFCM Contract No.
DFCM Bid DA14027 CONTRACTOR'S AGREEMENT PAGE NO. 2 is the base bid, and which sum also includes the cost of a 100% Performance Bond and a 100% Payment Bond as well as all insurance requirements of the Contractor. Said bonds have already been posted by the Contractor pursuant to State law. The required proof of insurance certificates have been delivered to DFCM in accordance with the General Conditions before the execution of this Contractor's Agreement. ARTICLE 3. TIME OF COMPLETION AND DELAY REMEDY.
DFCM Bid DA14027 CONTRACTOR'S AGREEMENT PAGE NO. 3 Such evidence of labor performed and materials furnished as the DFCM may reasonably require shall be supplied by the Contractor at the time of request for Certificate of Payment on account. Materials for which payment has been made cannot be removed from the job site without DFCM's written approval. Five percent (5%) of the earned amount shall be retained from each monthly payment.
DFCM Bid DA14027 CONTRACTOR'S AGREEMENT PAGE NO. 4 ARTICLE 11. DFCM'S RIGHT TO WITHHOLD CERTAIN AMOUNT AND MAKE USE THEREOF. The DFCM may withhold from payment to the Contractor such amount as, in DFCM's judgment, may be necessary to pay just claims against the Contractor or Subcontractor at any tier for labor and services rendered and materials furnished in and about the Work. The DFCM may apply such withheld amounts for the payment of such claims in DFCM's discretion.
DFCM Bid DA14027 CONTRACTOR'S AGREEMENT PAGE NO. 5 IN WITNESS WHEREOF, the parties hereto have executed this Contractor's Agreement on the day and year stated hereinabove.
DFCM Bid DA14027 PERFORMANCE BOND (Title 63, Chapter 56, U. C. A. 1953, as Amended) That hereinafter referred to as the "Principal" and , a corporation organized and existing under the laws of the State of , with its principal office in the City of and authorized to transact business in this State and U. S.
DFCM Bid DA14027 PAYMENT BOND (Title 63, Chapter 56, U. C. A. l953, as Amended) KNOW ALL PERSONS BY THESE PRESENTS: That hereinafter referred to as the "Principal," and , a corporation organized and existing under the laws of the State of authorized to do business in this State and U. S.
DFCM Bid DA14027 STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES Division of Facilities Construction and Management DFCM CERTIFICATE OF SUBSTANTIAL COMPLETION PROJECT: PROJECT NO.
DFCM Bid DA14027 PAST PERFORMANCE RATING EVALUATION DATE Address Firm Name City, State & Zip Code Firm Contact Phone Number Project Number & Name Project Manager Completion Date Service Provided Contract Amount RATINGS GUIDE 5-exceptional 4-Above Average 3-Average 2-Below Average 1-Unsatisfactory Quality of Product or Service Timeliness of Performance Business Relations Contractor/AE has demonstrated an exceptional level in any of the above four categories that justifies adding a point t
DFCM Bid DA14027 USP Background Check Form The following information is needed to perform a Criminal Background check. All Items must be filled in unless it doesn’t apply to them. (n/a) Project #: Full Name: Date of Birth: Social Security #: XXX-XX- Last 4 digits only unless requested Driver’s License #: ID# : State Issued: (if applies) Vehicles that will be brought into secured areas to work from will need to be put on the clearance.
DFCM Bid DA14027 Updated 5-22-2014 Utah Department of Corrections (DRAPER SITE) OUTSIDE CONTRACTOR RULES AND REGULATIONS 1. All contractors, sub-contractors, workers, architects, etc. must have picture identification on their person while working at the Prison. A Utah Driver's License or Driver's License Division I. D. is preferred, but we will accept pictured military I. D., etc. 2. All contractors, sub-contractors, workers, architects, etc.
DFCM Bid DA14027 11. Nothing may be taken from inmates. 12. No tools may be left unattended. Unattended tools will be confiscated. 13. Do not throw away broken or worn out saw blades of any kind at the prison site. Dispose of them off property, at your home, shop, or office, or you may give them to the security officer. 14. Explosive cartridges for Hilti guns, etc. must be locked up and/or strictly supervised at all times. Cartridge "clips" shall be disposed of away from prison property.
DFCM 18. Bid DA14027 Any person who the officer believes is arriving at the prison impaired by alcohol or drugs shall be denied access to prison property and may also be detained pending arrival of an Enforcement Officer who will determine if a citation or arrest is warranted. 19. When working inside the prison fence lines, all traffic is checked, searched, and cleared at our main truck gate sally ports.
DFCM Bid DA14027 by security personnel. All emergency situations will be resolved as soon as possible. 24. Work hours for construction within the prison fences will normally be limited strictly to daylight hours, Monday through Friday. If early morning, late evening, weekend, or holiday work is planned or needed, the project security staff must be contacted at least 72 hours in advance of approval. 25. Ex-inmates or parolees are normally not permitted to work on prison projects.
DFCM NOTE: Bid DA14027 Ladders which are not secured as per the above instructions will be confiscated. 27. Cutting torches and equipment shall not be left unattended in construction areas. All cutting torches, fuel tanks, etc. must be maintained on carts or vehicles and be removed from construction sites at the end of each work day., 28. Contractors will not be permitted to store flammable liquids or fuel tanks within the security fence perimeter.
DFCM 33. Bid DA14027 Contractors working at the Draper site on authorized bid projects are responsible to provide all of their own tools and equipment for the work involved in those projects. The prison will normally not permit contractor use of state-owned shops, tools, or equipment. 34.
DFCM Bid DA14027 Jerry Jensen / Facilities Director 14717 So. Minuteman Dr. Draper, Utah. 84020 This request can also be faxed to (801) 545-5702 attn: Jerry Please allow least five working days prior to the scheduled outage or interruption.
DFCM Bid DA14027 STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES Division of Facilities Construction and Management DFCM Stage II - PROJECT SCHEDULE BIDSYNC BID # DA14027 PROJECT NAME: DFCM PROJECT NO: Event Stage II Bidding Documents Available Background Check Form Submitted to Shawn Anderson at the Dept.
A B 1 2 3 EG001 COVER SHEET WASATCH B-BLOCK PLANS WASATCH B-BLOCK CONTROL PANEL DETAILS WASATCH B-BLOCK AV SYSTEM RISER WASATCH D-BLOCK PLANS WASATCH D-BLOCK CONTROL PANEL DETAILS WASATCH D-BLOCK AV SYSTEM RISER OQUIRRH HOUSING UNITS 1,2,3 & 4 KEY MAP AND GENERAL NOTES ET131 ET132 ET133 ET134 ET135 4 OQUIRRH HOUSING UNITS 1,2,3 & 4 GRADE LEVEL OQUIRRH HOUSING UNITS 1,2,3 & 4 MEZZANINE LEVEL OQUIRRH HOUSING UNITS CONTROL PANEL DETAILS OQUIRRH HOUSING UNITS EQUIPMENT SCHEDULES OQUIRRH HOUSING UNIT
A B C D 1 2 2 3 2 1 WASATCH B LEVEL 1 DEMO 2 TYP. 2 TYP. WASATCH B LEVEL 2 DEMO 2 TYP. 2 TYP. WASATCH B LEVEL 3 DEMO 2 TYP. 2 TYP. 3 3 4 4 5 5 2 TYP. 2 TYP. 2 TYP. 1 1 1 3 UP 3 UP 3 DN DN 6 6 EXISTING RACEWAYS MAY BE REUSED, IF IN PLACE, WHERE POSSIBLE, AND WHERE IN COMPLIANCE WITH THE SPECIFICATIONS AND THE INTENT OF THE CONTRACT DOCUMENTS. UPGRADE AND OR PROVIDE NEW CONDUIT SUPPORTS WHERE NECESSARY FOR ALL RACEWAYS BEING REUSED.
A B C D 1 EXISTING PART OF THE PANEL IS TO BE REPLACED. RE-LABEL ALL WIRES AND CONNECTORS ON BOTH WIRE AND PANEL SIDES, AND THEN DISCONNECT ALL WIRES AND DEVICES FROM THE PANEL. CUT THE PANEL ALONG THE DASHED LINE AND REFINISH THE CUTTING EDGES. RE-INSTALL PANELS BEING REUSED BACK IN PLACE. 3. 4. NO CHANGES SHALL BE MADE WITHOUT THE AV CONSULTANT'S WRITTEN CONSENT. PROVIDE THE OWNERS WITH A COPY OF THE CRESTRON PROGRAMING CODE UPON COMPLETION OF THE PROJECT. 7. 8.
A B C D 1 2 2 S S S S S S S S S S S S 3 S 1 S S S S 3 3 S S 3 3 S S WASATCH B LEVEL 1 S S WASATCH B LEVEL 2 S S 2 3 3 S WASATCH B LEVEL 3 S S 3 S S 3 S S S S S S S S S S S S S S S S S S 4 4 S S S S S S S S S S S S S S S S S S S S S S S S 2 2 2 S S S S M M MIC CLG S M M MIC CLG S M M MIC CLG S S S M S S M S S M S S 5 5 M S 1 5 2 2 ET112 1 S UP 6 4 ET111 UP TO SOUND CABINET
A B C D E F 5 ET112 NTS SCALE: NTS SCALE: NTS 1 ET112 4 LED RED TYP.
A B C D 1 2 SYMBOL DESCRIPTION MODEL QTY HONEYWELL CRESTRON PUSH BUTTON WITH LED, ALTERNATE, SQUARE, FOR MONITOR SWITCH BUTTON WITH LED WINDOW, WHITE CONTROLLER RELAY AND I/O BOX RACK MOUNT KIT CONTROL PANELS CUSTOM BELDEN LIBERTY WEST PENN WEST PENN BELDEN LIBERTY WEST PENN SPEAKER CABLE FOR LOW IMPEDANCE, FROM PANELS TO CABINET SPEAKER CABLE FOR HORNS MICROPHONE CABLE ATLAS ATLAS INSTALL PLENUM CABLES WHERE SUCH CABLES ARE REQUIRED.
A B C D 1 2 2 3 3 3 3 3 1 3 2 WASATCH D LEVEL 1 DEMO 3 WASATCH D LEVEL 2 DEMO 3 WASATCH D LEVEL 3 DEMO 3 4 4 5 5 2 2 2 5 5 5 4 4 4 1 1 1 UP UP DN DN 6 6 EXISTING RACEWAYS MAY BE REUSED, IF IN PLACE, WHERE POSSIBLE, AND WHERE IN COMPLIANCE WITH THE SPECIFICATIONS AND THE INTENT OF THE CONTRACT DOCUMENTS. UPGRADE AND OR PROVIDE NEW CONDUIT SUPPORTS WHERE NECESSARY FOR ALL RACEWAYS BEING REUSED. ENSURE INTEGRITY OF EXISTING RACEWAYS BEFORE REUSE.
A B C D 1 CONTRACTORS ARE REQUIRED TO VISIT THE JOBSITE, DOCUMENT EXISTING CONDITIONS THAT WILL EFFECT FINAL CONSTRUCTION COSTS PRIOR TO FINAL BID. REPLACE ALL NON-WORKING RELAYS AND POWER SUPPLIES SO THAT NEW AND EXISTING CONTROL PANELS ARE COMPLETELY FUNCTIONAL. INCLUDE AN ADDITIONAL 50% OF THE TOTAL QUANTITY OF ALL PUSH SWITCHES AND PUSH BUTTONS, LED'S, KEY SWITCHES IN BID PRICE . ALL AUDIO CABLES AND INTERCOM CABLES MUST BE INSTALLED IN CONDUITS.
A B C D 1 WD302 20'-0" A.F.F. 20'-0" A.F.F.
A B C D E ET122 5 ET122 6 ET122 7 NTS NTS SCALE: NTS 1 BUTTON DETAIL SCALE: KEY SWITCH DETAIL SCALE: LED DETAIL ET122 6 LED RED TYP. ET122 4 WINNING CONTRACTORS ARE REQUIRED TO CONTACT THE OWNERS' REPRESENTATIVES AND SCHEDULE THEIR WORKING HOURS TO BE DURING THE EVENING AND NIGHT TIMES FOR MINIMAL CONTROL SYSTEM DOWN TIMES. 11. LED GREEN POWER LEVEL 2 INMATE CALLS SCALE: NTS TEST LEVEL 3 ALL CALL OUTSIDE LEVEL 2 LEVEL 3 2 ALL LOW VOLTAGE SYSTEM WIRING IS SCHEMATIC.
CRESTRON CONTROLLER RELAY AND I/O BOX RACK MOUNT KIT RDL CONTROL PANELS BELDEN LIBERTY WEST PENN BELDEN LIBERTY WEST PENN SPEAKER CABLE FOR 70V SPEAKER CABLE FOR LOW IMPEDANCE, FROM PANELS TO CABINET 2 4 (PANEL 3) (PANEL 2) (PANEL 1) (PANEL 3) (PANEL 2) (PANEL 1) (PANEL 3) (PANEL 2) (PANEL 1) (PANEL 3) (PANEL 2) (PANEL 1) (PANEL 3) (PANEL 2) (PANEL 1) (PANEL 3) (PANEL 2) (PANEL 1) SPARE SPARE MONITOR MONITOR MONITOR LAMP TEST LAMP TEST LAMP TEST ALL CALL ALL CALL ALL CAL
6 11 PD D111 D110 7 11 PD 6 D107 D106 0 11 PD 1 11 PD 2 ES-4.5A D102 4 10 PD 5 10 PD D103 (TYP.) D104 7 10 PD 8 10 PD D105 D100 2 10 PD 6 6 14 6 PD173 PD174 D50 D148 PD167 PD170 3 9 11 D133 PD175 D135 D145 8 8 14 PD 7 14 PD D134 D130 5 14 PD 4 14 PD D132 PD169 2 14 PD 7 PD168 D152 PD165 6 2 D146 6 2 5 5 D182 D139 D181 D183 4 15 PD 3 15 PD D138 D184 1 15 PD D137 0 15 PD D136 BUILDING 4 D108 3 11 PD 4 11 PD D109 2 1 ES-4.
A B C D G F E 1 IC S 2 D 2 3 TYP. UP C 1 TYP. 2 IC 2 S TYP. IC TYP. IC MIC 3 3 OQUIRRH LEVEL 1 UNIT 1 DEMO 3 S IC S IC 6100A IC UP S IC MIC 2 TYP. IC IC S 2 ETD131 TYP. 5 3 4 3 TYP. 4 UP 3 3 TYP. 5 5 2 11 X D 2 6 ETD131 6 IC S EXISTING RACEWAYS MAY BE REUSED, IF IN PLACE, WHERE POSSIBLE, AND WHERE IN COMPLIANCE WITH THE SPECIFICATIONS AND THE INTENT OF THE CONTRACT DOCUMENTS.
A B C D 1 G F E 2 2 D DN C 3 1 3 OQUIRRH LEVEL 2 UNIT 1 DEMO B 1 TYP. 1 TYP. 100 A 6 A ETD132 4 4 DN 5 1 TYP. 4 DN 5 5 TYP. 1 3 2 6 1 6 1X DO NOT PENETRATE STRUCTURAL ELEMENTS OF FLOORS, WALLS, CEILINGS, ROOFS, ETC. 1.3 A NTS 7 DEMO INTERCOM RACKS - TYPICAL (3RD LEVEL) EXISTING RACK EXISTING CONDUIT (TYP) EXISTING JUNCTION BOX EXISTING CONDUIT (TYP) 2 EXISTING RACK REMOVE ALL EXISTING INTERCOM EQUIPMENT WITHIN RACK AND THE EXISTING RACK.
A B C D 1 2 2 3 3 4 4 3 4 1 2 INTERCOM DAYROOM DOOR DAY ROOM VOLUME PUSH TO TALK 5 LED PANEL MIC 5 LAMP TEST CLOSE PUSH TO TALK 2 PANEL 2A OPEN INTERCOM 2 MIC PUSH TO TALK PUSH TO TALK DAY ROOM CLOSE 3 3 OQUIRRH PANEL 3 DEMO OPEN OFF CLOSED OPEN PUSH TO TALK OQUIRRH PANEL 2 DEMO PANEL 2B INTERCOM SALLYPORT FRONT DOOR SERVICE DOOR VOLUME 1 OFF 3 4 1 4 LED PANEL OPEN 6 1 LAMP TEST CONTROL ROOM OUTSIDE ENTRY CLOSE INTERCOM PUSH TO TALK LED PANEL M
A B C D G F E 1 AB166 ROOM AB165 ROOM IC S A163 CLOSET C183 CLOSET A158-2 ROOM-2 A144 CLOSET IC(2) A155 ROOM C182 CLOSET A143 CELL A142 CELL A154 ROOM A156 HALL A160 A162 HALL ROOM A163 ROOM A141 CELL D 2 A140 CELL A153 ROOM A158-1 ROOM-1 A139 CELL S UP A138 CELL C A137 CELL S A135 CELL S S TO EQUIPMENT CABINET 1 A136 CELL IC S S S A134 CELL A130 DAYROOM A133 CELL S S S IC 3 A150 A132 CELL 2 ROOM A145 IC ROOM S B S
A B C D 1 G F E AB200 ROOM 2 2 A245 SHOWER A243 CELL A242 CELL A241 CELL D A240 CELL A239 CELL DN A238 CELL C A237 CELL 3 3 S A236 CELL A235 CELL S A234 CELL 1 A233 CELL S A247 S A232 CELL A230 BALCONY A231 SHOWER B A101-2 ET132 4 SHOWER-2 1 A230 SHOWER OQUIRRH LEVEL 2 UNIT 1 ELECTRONICS ROOM S B 100 A 6 4 A200 BALCONY S A202 CELL DN S S A228 CELL S 5 S S A227 A203 CELL CELL A204 S CELL A226 CELL S A225 A205 CELL S
A B C D 1 5 DAYROOM BUTTON, MAINTAINED, PUSH ON, PUSH OFF. WHITE RED LED. ROTARY SWITCH, MAINTAINED, BLACK. GREEN LED. RED LED. KEY SWITCH, MAINTAINED, BLACK. LAMP TEST BUTTON, MOMENTARY, BLACK. 2. 3. 4. 5. 6. 7. 8. OQUIRRH CONTROL PANEL DETAIL, TYPICAL PUSH TO TALK BUTTON, MOMENTARY, YELLOW. DETAIL NOTES: 1. 2 2 7 3 3 POWER INTERCOM DAYROOM DOOR DAY ROOM VOLUME PUSH TO TALK 6-3/8'' 2 LAMP TEST PANEL 3 CLOSE OPEN TYP. PUSH TO TALK MIC 1 5 8 4 6 5 TYP.
A/R PS24-50A PS24-20 PS-RK BELDEN LIBERTY WEST PENN WEST PENN ATLAS ATLAS ATLAS SPEAKER CABLE FOR PANEL SPEAKER RELAY CABLE, 6 CONDUCTORS POWERE SUPPLY, 24 VDC, 5A POWERE SUPPLY, 24 VDC, 2A RACK MOUNT SHELF, 3RU CUSTOM 5 6 7 A A/R E A A/R = AS REQUIRED RACK KIT A/R A/R ST-PC A/R POWER MODULE CRESTRON A/R ST-IO CRESTRON IO MODULE RACK KIT A/R SOLUS 4 SYMETRIX DSP A/R LV-50S-RM LOWELL A/R PANEL VOLUME CONTROL A/R SEE SHEET ET133 CEN-SW-POE-5 CRESTRON NETWORK SWITCH, 5 PORTS
A B PANEL MIC CLG ST-IO 4X8 DAY ROOM DOOR 2 DAY ROOM LOW CEILING SPEAKERS (TYP 8) 120V AMP #1 TO EXISTING PANEL POWER (ON/OFF) 3 KEY SWITCH PUSH TO TALK KEY SWITCH 120V AC LAMP TEST POWER SUPPLY INTERCOM 4 LED POWER SUPPLY LED LED 2W 8W 120V AC INTERCOM BUTTON DAY ROOM BUTTON KEY SWITCH DAY ROOM LOW CEILING SPEAKERS (TYP 8) DAY ROOM HIGH CEILING SPEAKERS (TYP 2) CONTROL ROOM INTERCOM BUTTON 8W SALLYPORT 8W DAY ROOM BUTTON PANEL #2A RISER FOR UNIT 1 CONTROL SYSTEM AMP #1
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 DRAPER PRISON WASATCH & OQUIRRH INTERCOM & PAGING SYSTEM REMODEL DFCM NO. 13304100 COVER SHEET 5/30/2014 2:08 PM 250000 – 1 p.
DFCM Bid DA14027 Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014 TABLE OF CONTENTS ITEM SECTION ELECTRICAL GENERAL PROVISIONS ELECTRICAL CONNECTIONS FOR EQUIPMENT ELECTRICAL SUPPORTS AND SEISMIC RESTRAINTS ELECTRICAL DEMOLITION CONDUIT RACEWAYS CONDUCTORS AND CABLES ELECTRICAL BOXES AND FITTINGS OVERCURRENT PROTECTIVE DEVICES GROUNDING GROUNDING AND BONDING FOR COMMUNICATIONS PUBLIC ADDRESS SYSTEMS INTERCOMMUNICATIONS AND PROGRAM SYSTEMS 260001 260070 260072 260080 260110 2
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260001 – ELECTRICAL GENERAL PROVISIONS PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section. B. Architectural, Structural, Mechanical and other applicable documents also apply to work of this section. 1.2 DESCRIPTION OF WORK: A. 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 5. 1.5 Bid DA14027 4-21-2014 "Or Equivalent" - Means to provide equivalent equipment. Such equipment must be approved by the Engineer prior to bidding. EXAMINATION OF SITE: A. Visit the site and verify existing field conditions prior to submitting bid. B. All costs arising from site conditions and/or preparation shall be included in the base bid. No additional charges will be allowed due to inadequate site inspection. 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 performed under this contract. 1.7 SUBMITTALS: A. The contractor shall submit complete shop drawings and other required submittals. Incomplete submittals will be returned to the contractor unreviewed. No time extensions or cost increases will be allowed for delays caused by the return of incomplete submittals. B.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 B. Certify the "Red Lined Drawings" for correctness. Indicate on each drawing the name of the general and electrical contractors with signatures of each representative responsible for the work. C.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 2.3 Bid DA14027 4-21-2014 SPARE PARTS: A. Provide spare parts as specified in Divisions 26, 27, and 28 sections. Deliver all spare parts to owner's representative prior to substantial completion. PART 3 – EXECUTION 3.1 GENERAL: A. Workmanship: Provide only first class workmanship from competent workers. Defective materials or workmanship will not be allowed on the project.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 been issued and signed by the Owner or his designated representative. The Contractor shall bear all costs associated with proceeding on any change order that has not been approved by the Owner or his designated representative. B. 3.3 Any damages caused by construction delays due to frivolous RFI’s, will be born solely by the Contractor. SAFETY PRECAUTIONS: A. 3.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3.8 Bid DA14027 4-21-2014 FIRE PENETRATION SEALS: A. Seal all raceway and/or cable penetrations through fire-rated floors, wall, and ceilings to prevent the spread of smoke, fire, toxic gas or water through the penetration either before, during or after fire.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260070 – ELECTRICAL CONNECTIONS FOR EQUIPMENT PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 C. Power Distribution Blocks: Provide Square D Type LB or Equivalent. D. Refer to other Division 26, 27, and 28 Sections for specification of electrical materials as applicable. PART 3 – EXECUTION 3.1 GENERAL: A. 3.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260072 – ELECTRICAL SUPPORTS AND SEISMIC RESTRAINTS PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. SUMMARY: A. This Section includes the following: 1. 2. 3. 1.3 Hangers and supports for electrical equipment and systems.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 authorities having jurisdiction, showing maximum ratings of restraint items and the basis for approval (tests or calculations). C. Coordination Drawings: Show coordination of seismic bracing for electrical components with other systems and equipment in the vicinity, including other supports and seismic restraints. D. Welding certificates. E. Qualification Data: For professional engineer and testing agency.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 a. 3. Metallic Coatings: Hot-dip galvanized after fabrication and applied according to MFMA-3. Channel Dimensions: Selected for structural loading and applicable seismic forces. C. Raceway and Cable Supports: As described in NECA 1. D. Conduit and Cable Support Devices: Steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported. E.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 B. Angle and Channel-Type Brace Assemblies: Steel angles or steel slotted-support-system components; with accessories for attachment to braced component at one end and to building structure at the other end. C. Cable Restraints: ASTM A 603, zinc-coated, steel wire rope attached to steel or stainless-steel thimbles, brackets, swivels, and bolts designed for restraining cable service. 1. 2. 3. 4. 5. 2.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 C. Install seismic-restraint components using methods approved by the evaluation service providing required submittals for component. D. Strength of Support and Seismic-Restraint Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static and seismic loads within specified loading limits.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel D. 3.5 Bid DA14027 4-21-2014 Attachment to Structure: If specific attachment is not indicated, anchor bracing to structure at flanges of beams, upper truss chords of bar joists, or at concrete members. FIELD QUALITY CONTROL: A. Testing Agency: Engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports. B.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260080 – ELECTRICAL DEMOLITION PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B. This section is a Division 26 General Provisions section, and is part of each Division 26, 27, and 28 sections making reference to electrical demolition. 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 C. Maintain circuit integrity and continuity of all existing circuits/feeders, and systems that interfere with or are interrupted by remodel work, unless those circuits/feeders are to be abandoned completely. Maintain all circuits and systems in operation during construction. Provide temporary panels, temporary wiring and conduits, etc. as required. D. Leave all existing fixtures, devices, equipment, etc.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260110 – CONDUIT RACEWAYS PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B. This section is a Division 26 General Provisions section, and is part of each Division 26, 27, and 28 sections making reference to conduit raceways. 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 accordance with Federal Specification WW-C-581. D. Electric Metallic Tubing (EMT): Provide electric metal tubing in accordance with Federal Specification WW-C-563 and ANSI C80.3. E. Flexible Metal Conduit: Provide zinc-coated, flexible metal conduit in accordance with Federal Specification WW-C-566. F.
DFCM Bid DA14027 Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel A. 3.2 4-21-2014 Install raceway and accessories in accordance with manufacturer's written instructions, applicable requirements of NEC, NEMA Standards, and NECA's "Standards of Installation", and in compliance with recognized industry practices to ensure that products fulfill requirements. LOCATIONS: A. Use RMC for exposed runs where conduit is subject to moisture, weather, or mechanical injury.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 areas. In equipment rooms, if lighting raceways are run exposed, installation shall not be done until piping and duct work layout has been determined in order that lighting boxes may be located so as to avoid being covered by overhead ducts and piping.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260120 – CONDUCTORS AND CABLES PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B. This section is a Division 26 General Provisions section, and is part of each Division 26, 27, and 28 sections making reference to conductors and cables. 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel C. 2.2 Bid DA14027 4-21-2014 Wire Sizes: As indicated on electrical drawings or as specified herein, but in no case less than No. 12 AWG. COPPER CONDUCTORS: A. Manufacturers: 1. 2. 3. 4. Cerro Wire & Cable Company. General Cable Technologies Corporation. Encore Wire Corporation. Southwire Incorporated. B. Refer to Part 3 "Conductor and Cable Applications" Article for application requirements. C. References and Ratings: 1. 2.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 F. Conductor Insulation Types: Heat- and moisture-resistant TPE insulation. G. Fillers and Wrapping: Non-wicking polypropylene fillers, with tissue-paper separator wrapped around the assembly. H. Outer Jacket: Black-colored, heat-, moisture-, and oil-resistant TPE jacket. I. Grounding: Insulated green grounding conductor. J. Cord Type: SO, hard-usage. 2.4 CONNECTORS AND SPLICES: A. Manufacturers: 1.
DFCM Bid DA14027 Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014 C. Use pulling means; including fish tape, cable, rope, and basket-weave wire/cable grips that will not damage cables or raceway. D. When raceway is not required, install concealed cables parallel and perpendicular to surfaces of structural members, and follow surface contours where possible. E. Support cables according to other applicable specification sections. F.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 unless specifically noted otherwise, if each circuit is from a different phase (a or b). 3.5 NEUTRAL CONDUCTORS: A. 3.6 LINE-TO-NEUTRAL BRANCH CIRCUITS: Provide a dedicated neutral for each line-to-neutral branch circuit. Size the neutral conductor the same as the phase conductor. In each outlet or junction box containing multiple neutral conductors, tag each neutral to identify which circuit it serves.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 2. 3. B. Bid DA14027 4-21-2014 Electrical Tests: a. Perform insulation resistance test on each conductors for feeders 100 amps and greater with respect to ground and adjacent conductors. Applied potential shall be 1000 volts dc for 1 minute. b. Perform continuity test to insure proper cable connection. Test Values: a. Minimum insulation resistance values shall not be less than two megaohms.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260135 – ELECTRICAL BOXES AND FITTINGS PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 adapting tile or plaster covers where necessary to set flush with finished surfaces. Where three raceway entries are made, provide outlet boxes with a minimum depth of 2-1/8". Gang boxes shall be used where more than one switch or device is located at one point. Sectional Boxes are not acceptable.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 installation. Construct of corrosion-resistant steel. PART 3 – EXECUTION 3.1 GENERAL: A. 3.2 Install electrical boxes and fittings in accordance with manufacturer's written instruction, applicable requirements of the NEC, NEMA Standards, and NECA's "Standards of Installation", and in compliance with recognized industry practices to ensure that products fulfill requirements. METHODS: A.
DFCM Bid DA14027 Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4-21-2014 SECTION 260180 - OVERCURRENT PROTECTIVE DEVICES PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B.
DFCM Bid DA14027 Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3. 4. B. Siemens Square D MOLDED CASE CIRCUIT BREAKERS: 1. 2. 2.3 4-21-2014 Provide factory-assembled, molded case circuit breakers as integral components of lighting and appliance panelboards, power panelboards, switchboards, and for individual mounting as indicated. Provide thermal magnetic, molded case circuit breakers of amperages, voltages, types, and short circuit current ratings indicated.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 260452 – GROUNDING PART 1 – GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification Sections, apply to work of this section. B. This section is a Division 26 General Provisions section, and is part of each Division 26, 27, and 28 sections making reference to grounding. 1.2 DESCRIPTION OF WORK: A.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel A. 2.6 Bid DA14027 4-21-2014 Provide exothermic welds. (Cadweld or equivalent) BONDING JUMPERS: A. 2.7 Provide bonding jumpers with hot dip galvanized malleable or ductile iron clamps, hot dip galvanized steel U-bolts, and tinned copper braids (OZ Gedney BJ Series or equivalent). GROUND BUS: A. Provide 1/4" x 4", copper ground bus complete with insulators and brackets in lengths and at mounting heights as indicated on drawings.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. SUMMARY A. Section Includes: 1. 2. 3. 4. 1.3 Grounding conductors. Grounding connectors. Grounding busbars. Grounding labeling.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 1.6 Bid DA14027 4-21-2014 CLOSEOUT SUBMITTALS A. 1.7 Operation and Maintenance Data: For grounding to include in operation and maintenance manuals. QUALITY ASSURANCE A. Installer Qualifications: Cabling Installer must have personnel certified by BICSI on staff. 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 4. 5. 6. 2.3 Bid DA14027 4-21-2014 Bonding Cable: 28 kcmils (14.2 sq. mm), 14 strands of No. 17 AWG conductor, and 1/4 inch (6.3 mm) in diameter. Bonding Conductor: No. 4 or No. 6 AWG, stranded conductor. Bonding Jumper: Tinned-copper tape, braided conductors terminated with two-hole copper ferrules; 1-5/8 inches (41 mm) wide and 1/16 inch (1.6 mm) thick. CONNECTORS A. Irreversible connectors listed for the purpose.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel C. 4-21-2014 Rack and Cabinet Grounding Busbars: Rectangular bars of hard-drawn solid copper, accepting conductors ranging from No. 14 to No. 2/0 AWG, NRTL listed as complying with UL 467, and complying with J-STD-607-A. Predrilling shall be with holes for use with lugs specified in this Section. 1. 2. 3. 2.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3.3 Bid DA14027 4-21-2014 APPLICATION A. Conductors: Install solid conductor for No. 8 AWG and smaller and stranded conductors for No. 6 AWG and larger unless otherwise indicated. 1. 2. B. Conductor Terminations and Connections: 1. 2. 3. 4. C. Pipe and Equipment Grounding Conductor Terminations: Bolted connectors. Underground Connections: Welded connectors except at test wells and as otherwise indicated.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3.5 Bid DA14027 4-21-2014 CONNECTIONS A. Bond metallic equipment in a telecommunications equipment room to the grounding busbar in that room, using equipment grounding conductors not smaller than No. 6 AWG. B. Stacking of conductors under a single bolt is not permitted when connecting to busbars. C. Assemble the wire connector to the conductor, complying with manufacturer's written instructions and as follows: 1. 2. 3.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 1. 2. 3. M. 4-21-2014 Install the conductors in grid pattern on 4-foot (1200-mm) centers, allowing bonding of one pedestal from each access floor tile. Bond the TGB of the equipment room to the reference grid at two or more locations. Bond all conduits and piping entering the equipment room to the TGB at the perimeter of the room. Towers and Antennas: 1. 2. 3. 4. 5.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 1. 2. 4-21-2014 Inspect physical and mechanical condition. Verify tightness of accessible, bolted, electrical connections with a calibrated torque wrench according to manufacturer's written instructions.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 275116 - PUBLIC ADDRESS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. 1.2 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. SUMMARY A.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel B. 1.4 Bid DA14027 4-21-2014 Zone: Separate group of loudspeakers and associated supply wiring that may be arranged for selective switching between different channels. ACTION SUBMITTALS A. Product Data: For each type of product. B. Shop Drawings: Power, signal, and control wiring. 1. 2. 3. 4. 5. 6. Include plans, elevations, sections, and attachment details. Include details of equipment assemblies.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 1.7 Bid DA14027 4-21-2014 MAINTENANCE MATERIAL SUBMITTALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. See notes on drawings. 1.8 QUALITY ASSURANCE A. B. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project, and 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 normally voided. In such cases, provide the Owner with a warranty equivalent to that of the original manufacturer. C. Replace defective materials and repair faulty workmanship within 72 hours of discovery at no cost to the Owner during the period of the warranty. D.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel a. b. c. d. 2. Bid DA14027 4-21-2014 Turn on the LED for the same button on the control panel; Route panel 1 microphone to Level 1 Day Room speakers; Un-mute level 1 Day Room speakers; Send a one second long pre-announcement tone to level 1 Day Room speakers; Release the Day Room button after making an announcement, the system shall: a. Mute level 1 Day Room speakers; b. Turn off LEDs for the level 1 Day Room buttons; D.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 2.4 Bid DA14027 4-21-2014 PATHWAYS A. Conduit and Boxes: Comply with Section 260110 “Conduit Raceways." PART 3 - EXECUTION 3.1 WIRING METHODS A. Wiring Method: Install cables in pathways and cable trays except within consoles, cabinets, desks, and counters. Conceal pathway and cables except in unfinished spaces. 1. Comply with requirements for pathways and boxes specified in Section 270528 "Pathways for Communications Systems.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3.4 Bid DA14027 4-21-2014 INSTALLATION A. Match input and output impedances and signal levels at signal interfaces. Provide matching networks where required. B. Identification of Conductors and Cables: Color-code conductors and apply wire and cable marking tape to designate wires and cables so they identify media in coordination with system wiring diagrams. C. Equipment Cabinet: 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 1. 2. Bid DA14027 4-21-2014 Power Output Test: Measure electrical power output of each power amplifier at normal gain settings of 50, 1000, and 12,000 Hz. Maximum variation in power output at these frequencies must not exceed plus or minus 1 dB. Signal Ground Test: Measure and report ground resistance at public address equipment signal ground.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 contract documents. 3.10 Demonstrate the operation of all system equipment. 3.11 Both subjective and objective tests will be required by the Consultant to determine compliance with the specifications. Provide test equipment specified by the Consultant for these tests. 3.12 Provide all final, "as-built" drawings, manuals, and other required documents.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 SECTION 275123 - INTERCOMMUNICATIONS AND PROGRAM SYSTEMS PART 1 - GENERAL 1.1 A. 1.2 A. RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. SUMMARY The scope of this project is to completely upgrade four Intercom systems in Unit A, B, C, and D of the Oquirrh building, which includes: 1.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 1.3 Bid DA14027 4-21-2014 ACTION SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: For intercommunications and program systems. Include plans, elevations, sections, details, and attachments to other work. 1. 2. 3. Detail equipment assemblies and indicate dimensions, weights, required clearances, method of field assembly, components, and location and size of each field connection.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 integrators will be listed in written addenda. D. 1.6 Specification Information Requests: Direct any requests for clarification, substitution, or changes in these specifications or drawings to the AV consultant. WARRANTY A. Warranty the entire system for a minimum of one year from the date of system acceptance by the Owner.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 2. 3. 4. B. Bid DA14027 4-21-2014 a. Turn on the system; b. Turn on listening mode; c. Turn on the rocker switch LED; d. Un-mute two Sallyport microphones; e. Route the Sallyport microphones to the control room speaker; Push and hold Push To Talk button: a. Mute two Sallyport microphones; b. Un-mute the control room microphone; c. Route the control room microphone to the Sallyport speakers; Release the Push To Talk button: a.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel x e. f. g. Allow officers to speak to the caller or to listen to the caller; x x Shut off the system; Turn off the Intercom LED button; Rotate the rotary switch to left and the system shall: x x x Close the door; Turn on the green LED; Turn off the red LED; Rotate the rotary switch to right, the system shall: Open the door; Turn off the green LED; Turn on the red LED; Section 3 of Panel 1: a.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 PART 3 - EXECUTION 3.1 WIRING METHODS A. Wiring Method: Install cables in raceways and cable trays except within consoles, cabinets, desks, and counters. Conceal raceway and cables except in unfinished spaces. 1. Comply with requirements for raceways and boxes specified in Section 260110 “Conduit Raceways." B.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3.4 Bid DA14027 4-21-2014 INSTALLATION A. Match input and output impedances and signal levels at signal interfaces. Provide matching networks where required. B. Identification of Conductors and Cables: Color-code conductors and apply wire and cable marking tape to designate wires and cables so they identify media in coordination with system wiring diagrams. C.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel 3.7 Bid DA14027 4-21-2014 FIELD QUALITY CONTROL 1. 2. Power Output Test: Measure electrical power output of each paging amplifier at normal gain settings of 150, 1000, and 2500 Hz. Maximum variation in power output at these frequencies is plus or minus 3 dB. Signal Ground Test: Measure and report ground resistance at system signal ground.
DFCM Draper Prison Wasatch & Oquirrh Intercom & Paging System Remodel Bid DA14027 4-21-2014 consist of the following: B. Take a physical inventory of all equipment on site and compare to equipment lists in the contract documents. 1. 2. 3. C. 3.11 A. 3.12 B. Demonstrate the operation of all system equipment. Both subjective and objective tests will be required by the Consultant to determine compliance with the specifications. Provide test equipment specified by the Consultant for these tests.
DFCM Bid DA14027 USP Background Check Form The following information is needed to perform a Criminal Background check. All Items must be filled in unless it doesn’t apply to them. (n/a) Project #: Full Name: Date of Birth: Social Security #: XXX-XX- Last 4 digits only unless requested Driver’s License #: ID# : State Issued: (if applies) Vehicles that will be brought into secured areas to work from will need to be put on the clearance.
DFCM Bid DA14027 Updated 5-22-2014 Utah Department of Corrections (DRAPER SITE) OUTSIDE CONTRACTOR RULES AND REGULATIONS 1. All contractors, sub-contractors, workers, architects, etc. must have picture identification on their person while working at the Prison. A Utah Driver's License or Driver's License Division I. D. is preferred, but we will accept pictured military I. D., etc. 2. All contractors, sub-contractors, workers, architects, etc.
DFCM Bid DA14027 11. Nothing may be taken from inmates. 12. No tools may be left unattended. Unattended tools will be confiscated. 13. Do not throw away broken or worn out saw blades of any kind at the prison site. Dispose of them off property, at your home, shop, or office, or you may give them to the security officer. 14. Explosive cartridges for Hilti guns, etc. must be locked up and/or strictly supervised at all times. Cartridge "clips" shall be disposed of away from prison property.
DFCM 18. Bid DA14027 Any person who the officer believes is arriving at the prison impaired by alcohol or drugs shall be denied access to prison property and may also be detained pending arrival of an Enforcement Officer who will determine if a citation or arrest is warranted. 19. When working inside the prison fence lines, all traffic is checked, searched, and cleared at our main truck gate sally ports.
DFCM Bid DA14027 by security personnel. All emergency situations will be resolved as soon as possible. 24. Work hours for construction within the prison fences will normally be limited strictly to daylight hours, Monday through Friday. If early morning, late evening, weekend, or holiday work is planned or needed, the project security staff must be contacted at least 72 hours in advance of approval. 25. Ex-inmates or parolees are normally not permitted to work on prison projects.
DFCM NOTE: Bid DA14027 Ladders which are not secured as per the above instructions will be confiscated. 27. Cutting torches and equipment shall not be left unattended in construction areas. All cutting torches, fuel tanks, etc. must be maintained on carts or vehicles and be removed from construction sites at the end of each work day., 28. Contractors will not be permitted to store flammable liquids or fuel tanks within the security fence perimeter.
DFCM 33. Bid DA14027 Contractors working at the Draper site on authorized bid projects are responsible to provide all of their own tools and equipment for the work involved in those projects. The prison will normally not permit contractor use of state-owned shops, tools, or equipment. 34.
DFCM Bid DA14027 Jerry Jensen / Facilities Director 14717 So. Minuteman Dr. Draper, Utah. 84020 This request can also be faxed to (801) 545-5702 attn: Jerry Please allow least five working days prior to the scheduled outage or interruption.
DFCM Bid DA14027 Question and Answers for Bid #DA14027 - Corrections-Intercom & Paging System Remodel Draper Prison-13304100 OVERALL BID QUESTIONS There are no questions associated with this bid. If you would like to submit a question, please click on the "Create New Question" button below. Question Deadline: Jun 18, 2014 4:00:00 PM MDT 5/30/2014 2:08 PM p.