Mira Event XS manual Power Shower Installation and User Guide These instructions are to be left with the user
Contents Introduction.............................................................................................. 3 Guarantee............................................................................................. 3 Recommended Usage........................................................................... 3 Important Safety Information.................................................................. 4 Pack Contents Checklist.........................................................................
Introduction Thank you for purchasing a quality Mira product. To enjoy the full potential of your new shower, please take time to read this guide thoroughly, and keep it handy for future reference. The Mira Event XS is a surface mounted all-in-one manual power shower. It is designed for use with a mains voltage electrical supply and gravity fed hot and cold water supplies. It features a built-in pump unit, manual mixer assembly and separate controls for flow and temperature.
Important Safety Information 1. Warning! 1.1. Products manufactured by us are safe and without risk provided they are installed, used and maintained in good working order in accordance with our instructions and recommendations. 1.2. This Appliance must be earthed. ENSURE SUPPLEMENTARY BONDING COMPLIES WITH THE "REQUIREMENTS FOR ELECTRICAL INSTALLATIONS". In accordance with the current edition of ‘The Plugs and Sockets etc.
1.15. Make a note of the layout of the wire runs and connections before removal, make sure that they are replaced and connected as noted. 2. Caution! 2.1. Read all of these instructions and retain this guide for later use. 2.2. Pass on this guide in the event of change of ownership of the installation site. 2.3. Follow all warnings, cautions and instructions contained in this guide. 2.4. Follow all warnings, cautions and instructions contained on or inside the Mira Event XS. 2.5.
Pack Contents Checklist Tick the appropriate boxes to familiarise yourself with the part names and to confirm that the parts are included.
Dimensions 310 84 210 115 20 28 66 80 All dimensions in millimetres 7
Specifications 1. General 1.1. Ambient temperature – Maximum recommended ambient temperature for the appliance is 30°C. 1.2. Maximum recommended hot water temperature – 65°C. Warning! For safety reasons set the maximum stored hot water temperature to between 60 and 65°C. Such temperatures are considered sufficient to meet all normal requirements and will also minimise the deposition of scale in hard water areas. 1.3.
3. Electrical 3.1. Appliance power supply – 230–240 V, 50 Hz, fused at 3 Amps, via a double pole switched fused connection unit (not supplied) with a minimum 3 mm contact separation in each pole. 3.2. Power supply connection – The Mira Event XS is fitted with a terminal block which will accept cable up to 2.5 mm². Minimum cable size (cross-sectional area) required under normal installation conditions is 1 mm2. 3.3. Absorbed power - Approximately 150 W under normal working conditions. 4. Standards 4.1.
Installation Requirements 1. General 1.1. Do not take risks with plumbing or electrical equipment. 1.2. Do not install the Mira Event XS in a position where it could become frozen. 1.3. Isolate electrical and water supplies before proceeding with the installation of the Mira Event XS. 1.4. The shower control must be fed from a cold water storage cistern and hot water cylinder providing nominally equal pressures. 1.5. The installation must be carried out by a competent installer. 1.
2.6. A 30mA residual current device (RCD) must be fitted. This may be part of the consumer unit or a separate unit. 3. Plumbing 3.1. Do not use excessive force when making connections to the flexible hoses or handset, finger tightness is sufficient. 3.2. Do not solder supply pipework with the Mira Event XS connected. Heat transmitted through the pipework will melt the inlet manifold. 3.3. The storage cistern should have a minimum storage capacity of 230 litres to provide adequate showering time.
Use the table below to calculate the actual head of water (x) needed in your installation. A = Total length of 15 mm pipe in hot water supply pipe run* B = Total length of 22 mm pipe in hot water supply pipe run* C = Total length of 15 mm pipe in cold water supply pipe run* D = Total length of 22 mm pipe in cold water supply pipe run* *Measure from the base of the cold water cistern to the relevant inlet port on the Mira Event XS.
4. Installation Diagrams To prevent operational difficulties, the feed from the cylinder should be as illustrated below. Side entry cylinder bosses are not recommended because: • A drop in cylinder water level could expose a top entry immersion element if fitted. • Air-in-water solution gathers at the edge of the cylinder and in the centre, during the heating process before travelling up the vent. 25 mm minimum A A Warning pipe Cistern Minimum 1.
Installation 1. Before You Start Decide where to site the Mira Event XS power shower. It should be positioned at a height convenient for all the family. The fittings should be fitted so the handset sprays away from the Mira Event XS, either down the centre line of the bath or across the shower cubicle opening. The Mira Event XS can support top, bottom or wall entry configurations for both the water and power supplies.
2. Configuring Inlet Supplies The Mira Event XS is supplied with blanking plugs fitted to all four ports of the inlet manifold. The pipework configuration will determine which blanking plugs and case inserts supplied must be fitted to the case. Supply Pipework Inlet Manifold Ports Case Inserts Top Entry Inlet Fit blanking plugs to bottom ports of the inlet manifold. Fit half insert in the top inlet of the case. Fit full insert in the bottom inlet of the case.
This procedure removes the top two blanking plugs from the inlet manifold for top or wall entry pipe configurations. Using this procedure as a guide, adjust the steps for bottom entry configurations as appropriate. Cover Retaining Screws 2.1. Remove the temperature knob concealing cap. Push-fit Release Tool 2.2. Use the push-fit release tool to lever off the temperature knob.
3. Shower Installation The following installation procedure is based on a bottom entry pipework configuration (rising hot and cold water supplies) and a top entry electrical supply configuration (via miniature trunking from above). Using this procedure as a guide, adjust the steps for alternative water supply or electrical supply configurations as appropriate. 3.1. Decide on a suitable location for the Mira Event XS avoiding buried cables and pipes.
3.6. Using a spirit level position, the appliance on the wall, then mark through the three fixing points. Tip! Special consideration should be given to the strength of the fixing arrangements when installing on to a dry lined, stud partition or dry partition wall structure. Installers may wish to obtain alternative proprietary cavity fixings, or choose other options such as fabricating rear supports using wooden blocks, however, these methods of fixing are beyond the scope of this guide.
Run the hot and cold water supply pipes at 28 mm centres, ensuring that the pipe ends project into the Mira Event XS by 30 mm to allow connection into the inlet manifold. Caution! Do not use stainless steel piping for inlet pipework. Caution! If chrome plated copper pipework is used then all traces of chrome plate must be removed from the connecting surfaces.
Important! This Mira Event XS must be fixed to the wall at all three fixing positions. The fixing holes are elongated to assist in vertical and horizontal alignment. 3.14. Screw the Mira Event XS to the wall using either the supplied wall screws or alternative fixings depending on the wall structure. Flow Spindle Do not over-tighten! Ensure that the electrical supply cable is correctly seated in the channel in the back of the case. 3.15.
Commissioning 1. General Commissioning 1.1. Make sure the flow control knob is turned to the "stop" position and the electrical supply is isolated. If applicable remove the appropriate circuit fuse. Caution! Do not over-tighten the hose connector. 1.2. Connect the flexible hose from the shower fitting to the outlet of the appliance. Ensure the hose washer is fitted. 1.3. Turn the water supplies fully on at the isolating valves. Check that water is not leaking from the bottom of the case. 1.4.
Operation Warning! The shower is a manual mixing shower which can select water temperatures from FULL HOT to FULL COLD. If the temperature control knob is turned anticlockwise fully the shower will deliver water at the same temperature as the stored hot water temperature (this will be the same temperature as the hot tap water temperature). Note! The shower is a manual mixing shower. The showering temperature will change if the incoming water temperature changes.
Fault Diagnosis 1. User Maintenance The Mira Event XS is fully performance tested after assembly. Providing the Mira Event XS has been correctly installed and is operated as advised, difficulties should not arise. In the unlikely event that you experience problems with your appliance then the following procedure will enable you to undertake basic fault finding before contacting the person responsible for installing your shower. Malfunction Cause Remedy Shower temperature too cold.
2. Installer Maintenance The Mira Event XS is one part of an entire plumbing system. The fitting of a pump places additional requirements on the plumbing system. Some systems may require plumbing modifications to allow them to cope with higher flow rates. Providing the Mira Event XS has been correctly installed and is operated as advised, difficulties should not arise. Fault diagnosis and maintenance must be carried out by a competent person for whom the fault diagnosis table is provided.
Blend temperature unstable. Inlet filter blocked. Clean filters. Isolating valve partially closed. Open valve. Spray plate blocked. Clean spray plate. Refer to the Installation and User guide supplied with the shower fittings. Drip from shower head. Solenoid valve defective. Renew the solenoid assembly. Pump does not operate. Electrical supply failure. Check power supply. PCB failure. Renew the PCB. Motor overheated, thermal switch operated.
Maintenance 1. General Read the section 'Important Safety Information' first. If any maintenance is required then it must carried out by a competent tradesperson for whom the maintenance instructions are provided. Before replacing any parts ensure that the underlying cause of the malfunction has been resolved. Warning! There are no user serviceable components beneath the cover of the appliance. Only a competent tradesperson should remove the cover. 2.
4. Inlet Filter Cap, Cleaning – Removal and Installation The following procedure can be applied for cleaning or renewing the inlet filter cap or inlet filter cap ‘O’ seals. Warning! Before proceeding, turn off the electrical and water supplies. The electricity supply must be turned off at the mains and, if applicable, the appropriate circuit fuse removed. Mains electrical connections are exposed when the cover is removed. 4.1. Remove the front cover, refer to section: 'Maintenance, 3.
5. Inlet Manifold, Check Valve - Removal and Installation The following procedure can be applied to cleaning or renewing the inlet manifold, inlet check valves or ‘O’ seals. Warning! Before proceeding turn off the electrical and water supplies. The electricity supply must be turned off at the mains and, if applicable, the appropriate circuit fuse removed. Mains electrical connections are exposed when the cover is removed. 5.1. Remove the front cover, refer to section: 'Maintenance, 3.
5.9. Inspect inlet manifold/valve interface seals and renew if required. Note! When refitting the inlet manifold, lightly grease seals with a silicone based lubricant. Ensure 'O' seals face the inlet manifold outlet ports Inlet Manifold Outlet Ports 5.10. Refit components in reverse order. 5.11. Restore the water supplies and check for any leaks. 5.12. Refit the cover and secure by tightening the three cover retaining screws, refit the temperature control knob and concealing cap.
Wiring Diagram POTENTIOMETER SWITCH ON/OFF THERMAL TRIP BLUE ORANGE MOTOR BROWN SOLENOID VALVE L N E BROWN 30
Spare Parts H 453.08 G A A,D,E D 453.22 G A D,E E C 453.28 A,F H E,G 147.67 B G E B,E,F B F 453.02 H 453.14 147.67 Check Valve Pack 453.06 453.02 Cartridge - Manual 453.03 Motor Pump Assembly - identified 'A' 453.06 Cover Assembly - Manual 453.07 Inlet Manifold Assembly - identified 'B' 453.08 PCB Assembly - Power 453.11 Harness Assembly - Manual - identified 'C' 453.13 Solenoid Valve Assembly - identified 'D' 453.14 Filter/Cap Assembly 453.15 Seal Pack - identified 'E' 453.
accessories Genuine Mira accessories can be purchased direct from Customers Services (our contact details can be found on the back cover of this guide) or from approved stockists or merchants. Eco Showerhead White - 2.1668.001 Chrome - 2.1668.002 The Eco shower head gives you an invigorating shower, but reduces water consumption and heating costs. Shower Seat White - 2.1536.128 White/Chrome - 2.1536.129 For use in or out of the showering area. Note! Must be installed onto a solid wall.
notes
notes
notes
Customer services Guarantee Your product has the benefit of our manufacturer’s guarantee which starts from the date of purchase. To activate this guarantee, please return your completed registration card, visit our website or free phone 0800 0731248 within 30 days of purchase (UK only). Within the guarantee period we will resolve defects in materials or workmanship, free of charge, by repairing or replacing parts or product as we may choose.