User guide
17
Temperature
Control Knob
Concealing
Cap
Push-t
Release
Tool
Cover Retaining
Screw
Cover Retaining
Screws
3. Shower Installation
The following installation procedure is based on a bottom entry pipework conguration
(rising hot and cold water supplies) and a top entry electrical supply conguration (via
miniature trunking from above). Using this procedure as a guide, adjust the steps for
alternative water supply or electrical supply congurations as appropriate.
3.1. Decide on a suitable location for
the Mira Event XS avoiding buried
cables and pipes. Leave a minimum
distance of 200 mm from the ceiling
to allow for the tting and removal
of the cover. Ensure that when the
hose retaining ring is placed on the
lowest position on the slide bar, there
is a minimum distance of 25 mm
between the handset and the bath
or shower tray spillover when the
handset is hanging down.
3.2. Fit the three rubber feet into the
recesses in the case as shown. The
feet will reduce the noise transmitted
by the power shower through the
wall.
3.3. Remove the temperature knob
concealing cap.
3.4. Insert the push-fit tool between
the temperature control knob and
cover directly under the temperature
indicator and lever off the temperature
knob.
3.5. Unscrew the three retaining screws
sufficiently to remove the shower
cover.
Note! The cover retaining screws are
captive and need not be removed.
Rubber
Feet
25 mm Minimum
Spill-over level
Hose Retaining Ring