User guide
19
Chamfer
Run the hot and cold water supply
pipes at 28 mm centres, ensuring
that the pipe ends project into the
Mira Event XS by 30 mm to allow
connection into the inlet manifold.
Caution! Do not use stainless steel
piping for inlet pipework.
Caution! If chrome plated copper
pipework is used then all traces
of chrome plate must be removed
from the connecting surfaces. If the
chrome is not completely removed
then the inlet manifold collet will fail
to grip the supply pipe and the pipes
will be forced out of the inlet manifold
due to the water supply pressure.
3.11. Ensure that the end of the supply
pipework is cut squarely and free
from burrs which can damage the
inlet manifold seals.
Chamfer the end of the pipe to assist
insertion into the tting and prevent
the ‘O’ seal tearing.
Note! PTFE tape or liquid jointing is
not required to assist connection.
Warning! Do not insert ngers into
the push-t connectors as this can
result in injury.
Caution! Thoroughly flush the
incoming hot and cold water
supply pipes to remove debris
before connecting the Mira Event
XS shower.
3.12. Push the supply pipework inside the
inlet manifold until resistance is felt.
DO NOT FORCE!
3.13. T h e co l l e t an d ‘ O ’ s e a l w i l l
automatically make a hydraulic
seal.